<?xml version="1.0" encoding="UTF-8"?><rss version="2.0" xmlns:media="http://search.yahoo.com/mrss/"><channel><title>Massive Corporation — All knowledge bases</title><description>Engineering answers on our services, building in steel, regulations, assembly and the full technical background — searchable.</description><link>https://massiveco.hu/</link><language>en</language><item><title>Technical library</title><link>https://massiveco.hu/library/</link><guid isPermaLink="true">https://massiveco.hu/library/</guid><description>The full background on technology, regulation and design: LGS, manufacturing, engineering, building physics, fire, certification, procedure.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Overview</category></item><item><title>What comes after the review</title><link>https://massiveco.hu/library/after-the-review/</link><guid isPermaLink="true">https://massiveco.hu/library/after-the-review/</guid><description>If the design is sound, we write that down too — it happens, and it is no disgrace. If it cannot be saved, we redesign it, partly or wholly.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Service: plan review</category></item><item><title>When the design exists but not for steel</title><link>https://massiveco.hu/library/already-designed-not-for-steel/</link><guid isPermaLink="true">https://massiveco.hu/library/already-designed-not-for-steel/</guid><description>It is common for someone to decide later that they would build in steel after all.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Service: LGS shop design</category></item><item><title>Authority inspection on site</title><link>https://massiveco.hu/library/authority-inspection/</link><guid isPermaLink="true">https://massiveco.hu/library/authority-inspection/</guid><description>From 1 October 2024 the building inspection authority ceased to exist and its tasks passed to the building authority.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Building procedure and design stages</category></item><item><title>Authority systems</title><link>https://massiveco.hu/library/authority-systems/</link><guid isPermaLink="true">https://massiveco.hu/library/authority-systems/</guid><description>Building administration runs on electronic systems: applications, documentation, the construction log. What they record is the evidence years later.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Building procedure and design stages</category></item><item><title>BIM basics</title><link>https://massiveco.hu/library/bim-basics/</link><guid isPermaLink="true">https://massiveco.hu/library/bim-basics/</guid><description>BIM is not software and not a 3D visual but a working method: information about the building is held in a structured model that several disciplines use.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>General design and BIM</category></item><item><title>The concept of a construction kit</title><link>https://massiveco.hu/library/building-kit/</link><guid isPermaLink="true">https://massiveco.hu/library/building-kit/</guid><description>A kit component is installed without a separate structural calculation, from the catalogue. A bespoke frame built on site is not a kit.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Construction products and certification</category></item><item><title>The legal framework of building</title><link>https://massiveco.hu/library/building-law-framework/</link><guid isPermaLink="true">https://massiveco.hu/library/building-law-framework/</guid><description>The sector&apos;s framework act is Act C of 2023 on Hungarian architecture; the procedural rules come from government decree 281/2024 (IX.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Building procedure and design stages</category></item><item><title>Our build-up guidelines</title><link>https://massiveco.hu/library/buildup-guidelines/</link><guid isPermaLink="true">https://massiveco.hu/library/buildup-guidelines/</guid><description>We can design practically any build-up that complies with the regulations.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Service: LGS shop design</category></item><item><title>Cavity barriers</title><link>https://massiveco.hu/library/cavity-barriers/</link><guid isPermaLink="true">https://massiveco.hu/library/cavity-barriers/</guid><description>Lightweight structures are full of cavities; where they run between storeys and compartments, fire and smoke spread hidden. Hence cavity barriers.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Fire safety and fire resistance</category></item><item><title>What the CE marking verifies</title><link>https://massiveco.hu/library/ce-marking/</link><guid isPermaLink="true">https://massiveco.hu/library/ce-marking/</guid><description>The CE marking applies to the product, not the system: it shows the section was made as the structural calculation assumes.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Construction products and certification</category></item><item><title>Construction products and certification</title><link>https://massiveco.hu/library/certification-overview/</link><guid isPermaLink="true">https://massiveco.hu/library/certification-overview/</guid><description>This topic is about what a construction product&apos;s paperwork verifies, who may issue it, and where its limits are.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Construction products and certification</category></item><item><title>Clash detection</title><link>https://massiveco.hu/library/clash-detection/</link><guid isPermaLink="true">https://massiveco.hu/library/clash-detection/</guid><description>Comparing the models shows where the services clash with the structure or two disciplines with each other.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>General design and BIM</category></item><item><title>Clash detection in practice</title><link>https://massiveco.hu/library/clash-in-practice/</link><guid isPermaLink="true">https://massiveco.hu/library/clash-in-practice/</guid><description>Comparing the models shows where the services clash with the structure.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Service: general design</category></item><item><title>Do I need my own architect?</title><link>https://massiveco.hu/library/client-own-architect/</link><guid isPermaLink="true">https://massiveco.hu/library/client-own-architect/</guid><description>You do not have to bring your own architect, but if you have one we are glad to work with them.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Service: general design</category></item><item><title>Concept design and project cost</title><link>https://massiveco.hu/library/concept-design/</link><guid isPermaLink="true">https://massiveco.hu/library/concept-design/</guid><description>Concept design is not about how the drawing looks but about decisions: massing, orientation, structural system, spans, number of storeys.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Building procedure and design stages</category></item><item><title>Why the concept decides the cost</title><link>https://massiveco.hu/library/concept-phase-structure/</link><guid isPermaLink="true">https://massiveco.hu/library/concept-phase-structure/</guid><description>The sketch design does not settle details but the massing, the spans, the number of storeys and the position of the bracing.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Service: general design</category></item><item><title>The construction log</title><link>https://massiveco.hu/library/construction-log/</link><guid isPermaLink="true">https://massiveco.hu/library/construction-log/</guid><description>The electronic construction log is the official record of the construction: who did what and when, what material was installed, what checks were made.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Building procedure and design stages</category></item><item><title>What counts as a construction product</title><link>https://massiveco.hu/library/construction-product-basics/</link><guid isPermaLink="true">https://massiveco.hu/library/construction-product-basics/</guid><description>A construction product is anything made for permanent incorporation that affects the basic requirements of the works. That decides if a DoP is needed.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Construction products and certification</category></item><item><title>Coordination between disciplines</title><link>https://massiveco.hu/library/coordination-workflow/</link><guid isPermaLink="true">https://massiveco.hu/library/coordination-workflow/</guid><description>Coordination is not everyone sending their drawings out: it is shared base data, regular meetings, recorded decisions and traceable change control.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>General design and BIM</category></item><item><title>Cost estimating by the designer</title><link>https://massiveco.hu/library/cost-estimation/</link><guid isPermaLink="true">https://massiveco.hu/library/cost-estimation/</guid><description>The accuracy of an estimate depends on the design stage: an order of magnitude at concept, a quantity-based bill at detailed design.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>General design and BIM</category></item><item><title>The declaration of performance</title><link>https://massiveco.hu/library/declaration-of-performance/</link><guid isPermaLink="true">https://massiveco.hu/library/declaration-of-performance/</guid><description>The document issued by the manufacturer that credibly verifies the performance of a construction product.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Construction products and certification</category></item><item><title>The design brief</title><link>https://massiveco.hu/library/design-brief/</link><guid isPermaLink="true">https://massiveco.hu/library/design-brief/</guid><description>The design brief is the document setting out what the client expects of the building: functions, sizes, quality expectations, budget, programme.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>General design and BIM</category></item><item><title>The design checker</title><link>https://massiveco.hu/library/design-checker/</link><guid isPermaLink="true">https://massiveco.hu/library/design-checker/</guid><description>The design checker is an independent professional who reviews the design documentation.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Building procedure and design stages</category></item><item><title>Design disciplines</title><link>https://massiveco.hu/library/design-disciplines/</link><guid isPermaLink="true">https://massiveco.hu/library/design-disciplines/</guid><description>A building typically needs an architect and structural, mechanical, electrical, fire and energy designers, plus others depending on the project.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>General design and BIM</category></item><item><title>Design stages</title><link>https://massiveco.hu/library/design-phases/</link><guid isPermaLink="true">https://massiveco.hu/library/design-phases/</guid><description>Concept, permit design, detailed design, then shop drawings for manufacture. Each answers a different question for a different user.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Building procedure and design stages</category></item><item><title>The design programme</title><link>https://massiveco.hu/library/design-schedule/</link><guid isPermaLink="true">https://massiveco.hu/library/design-schedule/</guid><description>The design disciplines build on one another, so the programme is not a list of deadlines but an order of dependencies.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>General design and BIM</category></item><item><title>Designer liability and indemnity</title><link>https://massiveco.hu/library/designer-liability/</link><guid isPermaLink="true">https://massiveco.hu/library/designer-liability/</guid><description>The designer is liable for the content of their design and for ensuring the construction documentation does not depart from the permit.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Building procedure and design stages</category></item><item><title>Designer qualifications</title><link>https://massiveco.hu/library/designer-qualification/</link><guid isPermaLink="true">https://massiveco.hu/library/designer-qualification/</guid><description>Government decree 266/2013 (VII. 11.) governs who may carry out architectural and engineering design and in which field.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Building procedure and design stages</category></item><item><title>Detailed design and BIM</title><link>https://massiveco.hu/library/detailed-design-bim/</link><guid isPermaLink="true">https://massiveco.hu/library/detailed-design-bim/</guid><description>Every discipline works in one model. Clashes are filtered out in 3D before anyone orders material.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Service: general design</category></item><item><title>The content of the detailed design</title><link>https://massiveco.hu/library/detailed-design-content/</link><guid isPermaLink="true">https://massiveco.hu/library/detailed-design-content/</guid><description>The construction documentation contains everything needed to build and to produce shop drawings, and shows the permit requirements are met.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Building procedure and design stages</category></item><item><title>The structural detailed design</title><link>https://massiveco.hu/library/detailed-structural-part/</link><guid isPermaLink="true">https://massiveco.hu/library/detailed-structural-part/</guid><description>Plans, sections, connections, reinforcement and erection drawings — detailed enough for the contractor to work from without asking.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Service: structural design</category></item><item><title>DoPC and the digital product passport</title><link>https://massiveco.hu/library/dopc-digital-passport/</link><guid isPermaLink="true">https://massiveco.hu/library/dopc-digital-passport/</guid><description>The new EU regulation replaces the declaration of performance with a declaration of performance and conformity, and introduces the digital product passport.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Construction products and certification</category></item><item><title>Drawings or model as the deliverable</title><link>https://massiveco.hu/library/drawings-vs-model/</link><guid isPermaLink="true">https://massiveco.hu/library/drawings-vs-model/</guid><description>The contractual deliverable is generally the drawn documentation, with the model often only a working tool.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>General design and BIM</category></item><item><title>Fire classification: EN 13501</title><link>https://massiveco.hu/library/en-13501-classification/</link><guid isPermaLink="true">https://massiveco.hu/library/en-13501-classification/</guid><description>It classifies two separate things: how materials contribute to a fire, and how long structures resist it.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Fire safety and fire resistance</category></item><item><title>ETA and EAD: the European route</title><link>https://massiveco.hu/library/eta-and-ead/</link><guid isPermaLink="true">https://massiveco.hu/library/eta-and-ead/</guid><description>A European Technical Assessment follows the same logic as the NMÉ, but is valid throughout the Union.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Construction products and certification</category></item><item><title>Surveying an existing building</title><link>https://massiveco.hu/library/existing-building-survey/</link><guid isPermaLink="true">https://massiveco.hu/library/existing-building-survey/</guid><description>For an extension or a rooftop addition the existing structure is the most important input: geometry, structural system, condition and capacity.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>General design and BIM</category></item><item><title>Fire spread on the facade</title><link>https://massiveco.hu/library/facade-fire-spread/</link><guid isPermaLink="true">https://massiveco.hu/library/facade-fire-spread/</guid><description>Fire can also spread up the facade: flames coming out of a window ignite the storey above, and a ventilated cavity can act as a chimney.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Fire safety and fire resistance</category></item><item><title>Fire compartmentation: why and where</title><link>https://massiveco.hu/library/fire-compartments/</link><guid isPermaLink="true">https://massiveco.hu/library/fire-compartments/</guid><description>A fire compartment is a part of the building separated from the rest by fire resisting structures so that fire does not spread further for a defined period.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Fire safety and fire resistance</category></item><item><title>How connections behave in fire</title><link>https://massiveco.hu/library/fire-connections/</link><guid isPermaLink="true">https://massiveco.hu/library/fire-connections/</guid><description>The fire resistance of a structure is decided not by the members but by the connections.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Fire safety and fire resistance</category></item><item><title>Fire resistance by calculation</title><link>https://massiveco.hu/library/fire-design-en-1993-1-2/</link><guid isPermaLink="true">https://massiveco.hu/library/fire-design-en-1993-1-2/</guid><description>Under the Eurocodes fire resistance can be verified by calculation: the capacity lost to heating is compared with the load during a fire.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Fire safety and fire resistance</category></item><item><title>Fire safety documentation</title><link>https://massiveco.hu/library/fire-documentation/</link><guid isPermaLink="true">https://massiveco.hu/library/fire-documentation/</guid><description>Fire documentation is a chain: the design solutions, the structures’ verification, the products’ declarations of performance and the site records.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Fire safety and fire resistance</category></item><item><title>Fire safety and fire resistance</title><link>https://massiveco.hu/library/fire-overview/</link><guid isPermaLink="true">https://massiveco.hu/library/fire-overview/</guid><description>This topic connects two things: what physically happens to a thin-walled steel structure in a fire, and what Hungarian regulation asks for.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Fire safety and fire resistance</category></item><item><title>Fire protective boards as a system</title><link>https://massiveco.hu/library/fire-protective-boards/</link><guid isPermaLink="true">https://massiveco.hu/library/fire-protective-boards/</guid><description>Fire-rated boards are good materials, but the rating comes from the structure tested with its frame, build-up and fixings — not from the board.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Fire safety and fire resistance</category></item><item><title>Fire simulation as verification</title><link>https://massiveco.hu/library/fire-simulation/</link><guid isPermaLink="true">https://massiveco.hu/library/fire-simulation/</guid><description>A fire and smoke simulation counts as verification when the engineer signs it for the specific project. One passed between projects does not.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Fire safety and fire resistance</category></item><item><title>Fire stopping of penetrations</title><link>https://massiveco.hu/library/fire-stopping/</link><guid isPermaLink="true">https://massiveco.hu/library/fire-stopping/</guid><description>Every pipe, cable and duct passing through a fire resisting structure punches a hole in the protection.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Fire safety and fire resistance</category></item><item><title>What happens when you write to us</title><link>https://massiveco.hu/library/first-contact/</link><guid isPermaLink="true">https://massiveco.hu/library/first-contact/</guid><description>We do not promise a specific response time, because we are people too. What we can say from experience: we respond fast by the standards of the profession.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Service: choosing a service</category></item><item><title>The legal side of a foreign project</title><link>https://massiveco.hu/library/foreign-project-legal/</link><guid isPermaLink="true">https://massiveco.hu/library/foreign-project-legal/</guid><description>The Eurocodes apply throughout Europe, so the logic of the design does not change at a border.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Building procedure and design stages</category></item><item><title>The four stages</title><link>https://massiveco.hu/library/four-phases/</link><guid isPermaLink="true">https://massiveco.hu/library/four-phases/</guid><description>Discussion, concept, permit, construction. The concept decides most of the cost; by detailed design, change is expensive.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Service: general design</category></item><item><title>Input data: what it takes to start</title><link>https://massiveco.hu/library/general-design-inputs/</link><guid isPermaLink="true">https://massiveco.hu/library/general-design-inputs/</guid><description>With slight exaggeration, the idea and the title deed: in general design we obtain the missing data, not you.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Service: general design</category></item><item><title>General design, disciplines, BIM</title><link>https://massiveco.hu/library/general-design-overview/</link><guid isPermaLink="true">https://massiveco.hu/library/general-design-overview/</guid><description>How a complete design package comes together: what general design is, which disciplines work together, where responsibility ends, what BIM adds.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>General design and BIM</category></item><item><title>General design</title><link>https://massiveco.hu/library/general-design-service/</link><guid isPermaLink="true">https://massiveco.hu/library/general-design-service/</guid><description>One contract, one responsible party, every discipline — from the needs assessment to a BIM model built for the contractor.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Service: general design</category></item><item><title>Handover documentation</title><link>https://massiveco.hu/library/handover-documentation/</link><guid isPermaLink="true">https://massiveco.hu/library/handover-documentation/</guid><description>At handover a document package changes hands too: as-built drawings, product verification, test records, fire and operating documents.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Building procedure and design stages</category></item><item><title>Harmonised standards</title><link>https://massiveco.hu/library/harmonised-standards/</link><guid isPermaLink="true">https://massiveco.hu/library/harmonised-standards/</guid><description>Where a harmonised European standard exists for a product, the declaration of performance derives from it and the manufacturer applies the CE marking.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Construction products and certification</category></item><item><title>IFC and data exchange</title><link>https://massiveco.hu/library/ifc-data-exchange/</link><guid isPermaLink="true">https://massiveco.hu/library/ifc-data-exchange/</guid><description>IFC is an open format for exchanging models: it carries the geometry and most of the element data, but not everything.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>General design and BIM</category></item><item><title>Fire questions around insulation materials</title><link>https://massiveco.hu/library/insulation-and-fire/</link><guid isPermaLink="true">https://massiveco.hu/library/insulation-and-fire/</guid><description>Choosing insulation is a fire decision too: on façades, in cavities and along escape routes the material’s reaction-to-fire class is regulated.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Fire safety and fire resistance</category></item><item><title>Intumescent coatings on thin sections</title><link>https://massiveco.hu/library/intumescent-limits/</link><guid isPermaLink="true">https://massiveco.hu/library/intumescent-limits/</guid><description>Proven on hot-rolled steel, not viable on thin-walled profiles: the section factor puts them outside the coating makers’ test tables.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Fire safety and fire resistance</category></item><item><title>Building procedure and design stages</title><link>https://massiveco.hu/library/legal-process-overview/</link><guid isPermaLink="true">https://massiveco.hu/library/legal-process-overview/</guid><description>What permit or notification a building needs, which design stages follow, and who takes part with which licence. The rules changed in 2023–24.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Building procedure and design stages</category></item><item><title>What we hand over</title><link>https://massiveco.hu/library/lgs-shop-deliverables/</link><guid isPermaLink="true">https://massiveco.hu/library/lgs-shop-deliverables/</guid><description>Member-by-member panel drawings, position numbering, material take-offs, and the machine program in that line&apos;s format.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Service: LGS shop design</category></item><item><title>LGS shop design</title><link>https://massiveco.hu/library/lgs-shop-design-service/</link><guid isPermaLink="true">https://massiveco.hu/library/lgs-shop-design-service/</guid><description>A buildable shop design from finished architectural or structural drawings, with the machine program and, if needed, supervision of trial production.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Service: LGS shop design</category></item><item><title>The local building code</title><link>https://massiveco.hu/library/local-building-code/</link><guid isPermaLink="true">https://massiveco.hu/library/local-building-code/</guid><description>The local building code says what can be built on the plot: coverage, height, siting, roof form. The first document to read on a project.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Building procedure and design stages</category></item><item><title>Levels of development (LOD)</title><link>https://massiveco.hu/library/lod-levels/</link><guid isPermaLink="true">https://massiveco.hu/library/lod-levels/</guid><description>Elements of a model are not equally detailed, and they do not need to be.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>General design and BIM</category></item><item><title>Machine independence in practice</title><link>https://massiveco.hu/library/machine-independence/</link><guid isPermaLink="true">https://massiveco.hu/library/machine-independence/</guid><description>The controller works to one of a few well-known logics, so the same design work can be issued to any compatible line.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Service: LGS shop design</category></item><item><title>The machine program: what we hand over</title><link>https://massiveco.hu/library/machine-program-delivery/</link><guid isPermaLink="true">https://massiveco.hu/library/machine-program-delivery/</guid><description>A file for the line controller, tailored to that machine&apos;s own parameters.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Service: LGS shop design</category></item><item><title>Machine survey</title><link>https://massiveco.hu/library/machine-survey-service/</link><guid isPermaLink="true">https://massiveco.hu/library/machine-survey-service/</guid><description>If you work with a machine we do not know, we map it: which profiles it can make, where it punches, which service holes it cuts, the maximum length.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Service: LGS shop design</category></item><item><title>Material optimisation</title><link>https://massiveco.hu/library/material-optimisation/</link><guid isPermaLink="true">https://massiveco.hu/library/material-optimisation/</guid><description>If you already have a design, we look at how much steel can come out of it without reducing safety.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Service: structural design</category></item><item><title>What we work in: steel, LGS, timber</title><link>https://massiveco.hu/library/materials-hrs-lgs-timber/</link><guid isPermaLink="true">https://massiveco.hu/library/materials-hrs-lgs-timber/</guid><description>Hot-rolled steel for long spans, light gauge steel as our speciality, timber where self-weight is the bottleneck.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Service: structural design</category></item><item><title>Model-based collaboration</title><link>https://massiveco.hu/library/model-based-collaboration/</link><guid isPermaLink="true">https://massiveco.hu/library/model-based-collaboration/</guid><description>The point of a common data environment is that everyone works from the same current state and change is traceable.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>General design and BIM</category></item><item><title>Needs assessment</title><link>https://massiveco.hu/library/needs-assessment/</link><guid isPermaLink="true">https://massiveco.hu/library/needs-assessment/</guid><description>We work through what you want, what the plot and the regulations allow, and what fits the budget.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Service: general design</category></item><item><title>The new construction products regulation</title><link>https://massiveco.hu/library/new-cpr-2024-3110/</link><guid isPermaLink="true">https://massiveco.hu/library/new-cpr-2024-3110/</guid><description>The Union adopted a new construction products regulation at the end of 2024, replacing Regulation 305/2011.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Construction products and certification</category></item><item><title>NMÉ: the national technical assessment</title><link>https://massiveco.hu/library/nme-process/</link><guid isPermaLink="true">https://massiveco.hu/library/nme-process/</guid><description>The Hungarian National Technical Assessment: a document for a construction product, valid in Hungary only, underlying its declaration of performance.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Construction products and certification</category></item><item><title>This is not a design check</title><link>https://massiveco.hu/library/not-a-design-check/</link><guid isPermaLink="true">https://massiveco.hu/library/not-a-design-check/</guid><description>What the legislation calls design checking is a separate role tied to a qualification, with defined formal requirements and a declaration.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Service: plan review</category></item><item><title>Optional structural note</title><link>https://massiveco.hu/library/optional-structural-note/</link><guid isPermaLink="true">https://massiveco.hu/library/optional-structural-note/</guid><description>If verification is needed we supply a structural calculation and note alongside the shop drawings.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Service: LGS shop design</category></item><item><title>The role of the OTÉK</title><link>https://massiveco.hu/library/otek-requirements/</link><guid isPermaLink="true">https://massiveco.hu/library/otek-requirements/</guid><description>Government decree 253/1997 sets general requirements for buildings: siting, ceiling heights, daylight, parking, accessibility, acoustic and thermal basics.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Building procedure and design stages</category></item><item><title>Lightweight technology in the fire code</title><link>https://massiveco.hu/library/otsz-lightweight-technology/</link><guid isPermaLink="true">https://massiveco.hu/library/otsz-lightweight-technology/</guid><description>Under the fire regulation, lightweight technology needs a tested system. What counts as one: the official interpretation gives three cases.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Fire safety and fire resistance</category></item><item><title>The Hungarian fire regulation</title><link>https://massiveco.hu/library/otsz-overview/</link><guid isPermaLink="true">https://massiveco.hu/library/otsz-overview/</guid><description>The National Fire Protection Regulation, decree 54/2014 (XII. 5.) BM, is the basic document for Hungarian fire safety requirements.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Fire safety and fire resistance</category></item><item><title>The content of the permit design</title><link>https://massiveco.hu/library/permit-design-content/</link><guid isPermaLink="true">https://massiveco.hu/library/permit-design-content/</guid><description>The permit documentation is produced for the authority procedure: it demonstrates that the proposed building complies with the legal and planning requirements.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Building procedure and design stages</category></item><item><title>The permit package</title><link>https://massiveco.hu/library/permit-package/</link><guid isPermaLink="true">https://massiveco.hu/library/permit-package/</guid><description>The full documentation required for the authority procedure, with the disciplines&apos; input. We handle the administration too if you want.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Service: general design</category></item><item><title>The building permit procedure</title><link>https://massiveco.hu/library/permit-procedure/</link><guid isPermaLink="true">https://massiveco.hu/library/permit-procedure/</guid><description>Governed by government decree 281/2024: an electronic application, specialist questions examined, and an authority decision valid for a set period.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Building procedure and design stages</category></item><item><title>The structural part of the permit design</title><link>https://massiveco.hu/library/permit-structural-part/</link><guid isPermaLink="true">https://massiveco.hu/library/permit-structural-part/</guid><description>Structural calculation, structural arrangement, technical description — coordinated with the architect so that it does not generate a request for missing items.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Service: structural design</category></item><item><title>Permit or simple notification</title><link>https://massiveco.hu/library/permit-vs-notification/</link><guid isPermaLink="true">https://massiveco.hu/library/permit-vs-notification/</guid><description>Not all work needs a permit: some needs no notification, many single-family houses need a simple notification, the rest a building permit.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Building procedure and design stages</category></item><item><title>Plan review and redesign</title><link>https://massiveco.hu/library/plan-review-service/</link><guid isPermaLink="true">https://massiveco.hu/library/plan-review-service/</guid><description>If the drawings you were given look wrong, it is cheaper to have them checked now than to meet the problem on site.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Service: plan review</category></item><item><title>How we price</title><link>https://massiveco.hu/library/pricing-logic/</link><guid isPermaLink="true">https://massiveco.hu/library/pricing-logic/</guid><description>We start from a price per square metre and correct it by complexity. The two extremes behave the opposite way from what you would expect.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Service: choosing a service</category></item><item><title>Specifying and installing a product</title><link>https://massiveco.hu/library/product-incorporation-275-2013/</link><guid isPermaLink="true">https://massiveco.hu/library/product-incorporation-275-2013/</guid><description>Decree 275/2013: a declaration verifies the product’s performance, the designer specifies what is needed, the contractor verifies what was installed.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Construction products and certification</category></item><item><title>Product and system certification</title><link>https://massiveco.hu/library/product-vs-system/</link><guid isPermaLink="true">https://massiveco.hu/library/product-vs-system/</guid><description>A product&apos;s verification is about what the material can do. A system&apos;s verification is about what the assembled structure can do.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Construction products and certification</category></item><item><title>Qualification, signature, liability</title><link>https://massiveco.hu/library/qualification-and-signature/</link><guid isPermaLink="true">https://massiveco.hu/library/qualification-and-signature/</guid><description>Drawings are signed by a qualified designer, and the liability stays with them.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Service: choosing a service</category></item><item><title>Reaction to fire classes: from A1 to F</title><link>https://massiveco.hu/library/reaction-to-fire/</link><guid isPermaLink="true">https://massiveco.hu/library/reaction-to-fire/</guid><description>The class describes how much a material contributes to a fire: A1 is non-combustible, F is unclassified.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Fire safety and fire resistance</category></item><item><title>How to read a declaration of performance</title><link>https://massiveco.hu/library/reading-a-dop/</link><guid isPermaLink="true">https://massiveco.hu/library/reading-a-dop/</guid><description>Compare four things: the product type with what was installed, the intended use with the location, the values with the requirement — and where NPD stands.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Construction products and certification</category></item><item><title>What REI means and what it applies to</title><link>https://massiveco.hu/library/rei-explained/</link><guid isPermaLink="true">https://massiveco.hu/library/rei-explained/</guid><description>R stands for load-bearing capacity, E for integrity against fire spread, I for insulation, and the number for how many minutes these are maintained.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Fire safety and fire resistance</category></item><item><title>Responsibility between disciplines</title><link>https://massiveco.hu/library/responsibility-boundaries/</link><guid isPermaLink="true">https://massiveco.hu/library/responsibility-boundaries/</guid><description>Mistakes tend to arise not inside the disciplines but at their boundaries: where everyone assumed the other would do it.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>General design and BIM</category></item><item><title>The responsible technical manager</title><link>https://massiveco.hu/library/responsible-technical-manager/</link><guid isPermaLink="true">https://massiveco.hu/library/responsible-technical-manager/</guid><description>The responsible technical manager directs construction to the design and certifies in the construction log that the structure matches it.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Building procedure and design stages</category></item><item><title>Fire risk classification</title><link>https://massiveco.hu/library/risk-classification/</link><guid isPermaLink="true">https://massiveco.hu/library/risk-classification/</guid><description>The Hungarian fire regulation uses four risk classes: very low, low, moderate and high.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Fire safety and fire resistance</category></item><item><title>Risk ranking</title><link>https://massiveco.hu/library/risk-ranking/</link><guid isPermaLink="true">https://massiveco.hu/library/risk-ranking/</guid><description>You do not get an eighty-point list. We weight it: what is a structural risk, what merely makes it more expensive, and what is only cosmetic.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Service: plan review</category></item><item><title>Section factor and heating</title><link>https://massiveco.hu/library/section-factor-heating/</link><guid isPermaLink="true">https://massiveco.hu/library/section-factor-heating/</guid><description>The speed of heating is set by the ratio of the heated surface to the amount of material in the cross-section.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Fire safety and fire resistance</category></item><item><title>The fastest route: send everything</title><link>https://massiveco.hu/library/send-everything/</link><guid isPermaLink="true">https://massiveco.hu/library/send-everything/</guid><description>This is the one thing that is up to you. The more information we get at the start, the sooner we can answer properly and the fewer rounds it takes.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Service: choosing a service</category></item><item><title>Design services and working method</title><link>https://massiveco.hu/library/services-overview/</link><guid isPermaLink="true">https://massiveco.hu/library/services-overview/</guid><description>This knowledge base describes how we work: what each service covers, what input it needs, what we hand over, and what it costs.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Service: choosing a service</category></item><item><title>Steel shop drawings</title><link>https://massiveco.hu/library/shop-drawing-steel/</link><guid isPermaLink="true">https://massiveco.hu/library/shop-drawing-steel/</guid><description>Member-by-member shop drawings, material take-offs, welding and bolting symbols.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Service: structural design</category></item><item><title>Shop drawings: who is responsible</title><link>https://massiveco.hu/library/shop-drawings/</link><guid isPermaLink="true">https://massiveco.hu/library/shop-drawings/</guid><description>Shop drawings are detailed drawings produced from the detailed design for the manufacturer, matching the equipment and technology of the factory.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Building procedure and design stages</category></item><item><title>Simple notification</title><link>https://massiveco.hu/library/simple-notification/</link><guid isPermaLink="true">https://massiveco.hu/library/simple-notification/</guid><description>Within a defined range — typically a new dwelling of no more than 300 m² total useful floor area — a simple notification replaces the building permit procedure.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Building procedure and design stages</category></item><item><title>The simple notification package</title><link>https://massiveco.hu/library/simple-notification-package/</link><guid isPermaLink="true">https://massiveco.hu/library/simple-notification-package/</guid><description>Within a defined range of single dwellings there is no permit procedure, but there is a mandatory design content, mandatory participants and a fixed process.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Service: general design</category></item><item><title>Site data, survey and setting out</title><link>https://massiveco.hu/library/site-data-surveys/</link><guid isPermaLink="true">https://massiveco.hu/library/site-data-surveys/</guid><description>Starting a design means knowing the plot: the exact boundaries, the levels, the existing structures and the utilities.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>General design and BIM</category></item><item><title>Supervision and construction management</title><link>https://massiveco.hu/library/site-supervision/</link><guid isPermaLink="true">https://massiveco.hu/library/site-supervision/</guid><description>We will accompany the work on site if you want. With one condition: we only take on construction management for our own design.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Service: general design</category></item><item><title>What we hand over</title><link>https://massiveco.hu/library/structural-deliverables/</link><guid isPermaLink="true">https://massiveco.hu/library/structural-deliverables/</guid><description>It depends on the stage: the authority part at permit level, full documentation at detailed level, drawings and take-offs in shop design.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Service: structural design</category></item><item><title>Structural expert opinion</title><link>https://massiveco.hu/library/structural-expert-opinion/</link><guid isPermaLink="true">https://massiveco.hu/library/structural-expert-opinion/</guid><description>On the capacity of an existing structure, whether it can be built on or altered.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Service: structural design</category></item><item><title>Structural and discipline design</title><link>https://massiveco.hu/library/structural-service/</link><guid isPermaLink="true">https://massiveco.hu/library/structural-service/</guid><description>Steel, light gauge steel and timber. From permit design through detailed design to shop drawings, from houses to shopping centres.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Service: structural design</category></item><item><title>Structural and discipline software</title><link>https://massiveco.hu/library/structural-software/</link><guid isPermaLink="true">https://massiveco.hu/library/structural-software/</guid><description>Different tools at different stages: global model, member checks, discipline models, manufacturing output. What matters is how they hand data on.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>General design and BIM</category></item><item><title>Technical assessment bodies</title><link>https://massiveco.hu/library/tab-organisations/</link><guid isPermaLink="true">https://massiveco.hu/library/tab-organisations/</guid><description>ÉMI is an organisation, not a document: a designated technical assessment body (TAB) issuing technical assessments under its designation.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Construction products and certification</category></item><item><title>Team assembly</title><link>https://massiveco.hu/library/team-assembly/</link><guid isPermaLink="true">https://massiveco.hu/library/team-assembly/</guid><description>We pick the disciplines for the project: architect, mechanical, electrical, fire, acoustics — whatever is needed.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Service: general design</category></item><item><title>The three steps</title><link>https://massiveco.hu/library/three-steps/</link><guid isPermaLink="true">https://massiveco.hu/library/three-steps/</guid><description>Architectural design, permit and detailed design, machine file. Shop design ends a process — we can join at any step.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Service: LGS shop design</category></item><item><title>Programme: how long a design takes</title><link>https://massiveco.hu/library/timeline/</link><guid isPermaLink="true">https://massiveco.hu/library/timeline/</guid><description>The permit design for a shed is a few weeks; the detailed design for a complex public building is months.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Service: choosing a service</category></item><item><title>Trial production</title><link>https://massiveco.hu/library/trial-production-service/</link><guid isPermaLink="true">https://massiveco.hu/library/trial-production-service/</guid><description>We accompany the first run and refine the program from what it shows. The second project then runs without a hitch on the same machine.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Service: LGS shop design</category></item><item><title>Status of the fire safety guidelines</title><link>https://massiveco.hu/library/tvmi-status/</link><guid isPermaLink="true">https://massiveco.hu/library/tvmi-status/</guid><description>The fire safety guidelines are voluntary, but following them is presumed to meet the regulation; departing from them needs other proof.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Fire safety and fire resistance</category></item><item><title>Fire characteristics of structures</title><link>https://massiveco.hu/library/tvmi-structures/</link><guid isPermaLink="true">https://massiveco.hu/library/tvmi-structures/</guid><description>How a structure’s fire characteristics can be established: by test, extended application, standard classification or calculation.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Fire safety and fire resistance</category></item><item><title>Utility connections</title><link>https://massiveco.hu/library/utilities-connections/</link><guid isPermaLink="true">https://massiveco.hu/library/utilities-connections/</guid><description>Water, drainage, power, gas and telecoms connections are settled at the start of design: they often take longer than the permit.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>General design and BIM</category></item><item><title>What happens if the input is incomplete</title><link>https://massiveco.hu/library/what-happens-if-input-missing/</link><guid isPermaLink="true">https://massiveco.hu/library/what-happens-if-input-missing/</guid><description>Three routes: we ask back, we work to a recorded assumption, or the work stops. What we do not do is assume silently.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Service: structural design</category></item><item><title>What general design is</title><link>https://massiveco.hu/library/what-is-general-design/</link><guid isPermaLink="true">https://massiveco.hu/library/what-is-general-design/</guid><description>One party is responsible for the whole design package: it coordinates the disciplines and holds programme and responsibility. One partner, not six.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>General design and BIM</category></item><item><title>What we do not take on</title><link>https://massiveco.hu/library/what-we-do-not-take/</link><guid isPermaLink="true">https://massiveco.hu/library/what-we-do-not-take/</guid><description>Fully monolithic reinforced concrete. We design foundations, cores and walls in concrete, but for a mostly RC building we recommend someone else.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Service: choosing a service</category></item><item><title>What you can estimate yourself</title><link>https://massiveco.hu/library/what-you-can-estimate/</link><guid isPermaLink="true">https://massiveco.hu/library/what-you-can-estimate/</guid><description>You know the floor area; we see the complexity. With storeys, spans and the share of bespoke parts we can give an order of magnitude.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Service: choosing a service</category></item><item><title>When a design checker is needed</title><link>https://massiveco.hu/library/when-design-checker/</link><guid isPermaLink="true">https://massiveco.hu/library/when-design-checker/</guid><description>In certain cases legislation prescribes it; otherwise the client decides.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Service: structural design</category></item><item><title>When no system document is required</title><link>https://massiveco.hu/library/when-no-system-document/</link><guid isPermaLink="true">https://massiveco.hu/library/when-no-system-document/</guid><description>For a frame built and lined on site, the official reading is that no NMÉ or ETA can be required: design and a log entry verify compliance.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Construction products and certification</category></item><item><title>Where we work</title><link>https://massiveco.hu/library/where-we-work/</link><guid isPermaLink="true">https://massiveco.hu/library/where-we-work/</guid><description>Based in Budapest, working remotely by default — the nature of design work makes that enough on most projects.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Service: choosing a service</category></item><item><title>The service first, the price after</title><link>https://massiveco.hu/library/which-service-do-i-need/</link><guid isPermaLink="true">https://massiveco.hu/library/which-service-do-i-need/</guid><description>The first step is not the price but what you need: a shop-drawing request can turn out to need a structural redesign — or half as much.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Service: choosing a service</category></item><item><title>We design, we do not manufacture</title><link>https://massiveco.hu/library/who-manufactures/</link><guid isPermaLink="true">https://massiveco.hu/library/who-manufactures/</guid><description>If you do not have your own machine, we can recommend a manufacturer who works from our drawings.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Service: LGS shop design</category></item><item><title>Working with the other disciplines</title><link>https://massiveco.hu/library/working-with-other-disciplines/</link><guid isPermaLink="true">https://massiveco.hu/library/working-with-other-disciplines/</guid><description>Mistakes arise at the boundaries between disciplines, so we fix in writing at the start who gives which data to whom, and when.</description><pubDate>Mon, 12 Oct 2026 23:01:33 GMT</pubDate><category>Service: structural design</category></item><item><title>Sound insulation basics</title><link>https://massiveco.hu/library/acoustics-basics/</link><guid isPermaLink="true">https://massiveco.hu/library/acoustics-basics/</guid><description>Three things give sound insulation: mass, decoupling of the layers, and damping.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Building physics and build-ups</category></item><item><title>Airtightness and the blower door</title><link>https://massiveco.hu/library/airtightness-blower-door/</link><guid isPermaLink="true">https://massiveco.hu/library/airtightness-blower-door/</guid><description>Airtightness measures how much air leaks through the structure. The blower door test is also feedback on the quality of the vapour control.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Building physics and build-ups</category></item><item><title>Applications and operation</title><link>https://massiveco.hu/library/applications-overview/</link><guid isPermaLink="true">https://massiveco.hu/library/applications-overview/</guid><description>What the technology is and is not good for, how it goes up on site, what to check and when, and what happens to the building over decades.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Applications and operation</category></item><item><title>Fixing the bottom track to the substrate</title><link>https://massiveco.hu/library/base-track-fixing/</link><guid isPermaLink="true">https://massiveco.hu/library/base-track-fixing/</guid><description>Where the panel meets the foundation: load transfer, ground moisture, tolerances and the thermal bridge at the base all meet in this connection.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>LGS structural design</category></item><item><title>Board materials: what belongs where</title><link>https://massiveco.hu/library/board-materials/</link><guid isPermaLink="true">https://massiveco.hu/library/board-materials/</guid><description>A framed wall’s performance is largely decided by its boards: hardness, fire resistance, sound insulation, durability outside. Named, with prices.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Building physics and build-ups</category></item><item><title>Building physics and build-ups</title><link>https://massiveco.hu/library/building-physics-overview/</link><guid isPermaLink="true">https://massiveco.hu/library/building-physics-overview/</guid><description>How a frame becomes a well-performing wall, floor and roof: insulation, thermal bridges, vapour control, airtightness, sound insulation.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Building physics and build-ups</category></item><item><title>Built-up (boxed) sections</title><link>https://massiveco.hu/library/built-up-sections/</link><guid isPermaLink="true">https://massiveco.hu/library/built-up-sections/</guid><description>Two or more sections built up together give a cross-section that resists twisting better and carries greater concentrated load.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>LGS structural design</category></item><item><title>Coil, tolerances and material verification</title><link>https://massiveco.hu/library/coil-material-and-tolerances/</link><guid isPermaLink="true">https://massiveco.hu/library/coil-material-and-tolerances/</guid><description>Every profile starts from a steel coil whose thickness, strength and coating are given with tolerances.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>LGS fundamentals and materials</category></item><item><title>Cold-formed and hot-rolled steel</title><link>https://massiveco.hu/library/cold-formed-vs-hot-rolled/</link><guid isPermaLink="true">https://massiveco.hu/library/cold-formed-vs-hot-rolled/</guid><description>A hot-rolled section gets its shape while glowing; a cold-formed one is made from cold sheet with rollers.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>LGS fundamentals and materials</category></item><item><title>What cold forming does to steel</title><link>https://massiveco.hu/library/cold-working-strain-hardening/</link><guid isPermaLink="true">https://massiveco.hu/library/cold-working-strain-hardening/</guid><description>During bending the material work-hardens in the corners: yield strength rises, formability drops.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>LGS fundamentals and materials</category></item><item><title>Common site errors</title><link>https://massiveco.hu/library/common-site-errors/</link><guid isPermaLink="true">https://massiveco.hu/library/common-site-errors/</guid><description>The typical faults are not spectacular: an omitted screw, wider spacing, missing bracing or cavity barrier, a punctured vapour control layer.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Applications and operation</category></item><item><title>Composite steel-concrete floors</title><link>https://massiveco.hu/library/composite-decks/</link><guid isPermaLink="true">https://massiveco.hu/library/composite-decks/</guid><description>The profiled steel sheet is formwork and reinforcement at once: the concrete is cast on it and the two work together.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Hot-rolled steel and mixed structures</category></item><item><title>Condensation risk check</title><link>https://massiveco.hu/library/condensation-risk/</link><guid isPermaLink="true">https://massiveco.hu/library/condensation-risk/</guid><description>The moisture calculation shows where condensation can occur in the structure and whether it can dry out.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Building physics and build-ups</category></item><item><title>Continuous external insulation</title><link>https://massiveco.hu/library/continuous-insulation/</link><guid isPermaLink="true">https://massiveco.hu/library/continuous-insulation/</guid><description>Insulation between the studs is not enough on its own, because the sections interrupt it.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Building physics and build-ups</category></item><item><title>Corrosion and service life</title><link>https://massiveco.hu/library/corrosion-protection-service-life/</link><guid isPermaLink="true">https://massiveco.hu/library/corrosion-protection-service-life/</guid><description>Galvanised steel corrodes where moisture gets in and cannot escape. In a well-built wall that does not happen: it is a design question, not a material one.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>LGS fundamentals and materials</category></item><item><title>Protection against ground moisture</title><link>https://massiveco.hu/library/damp-proofing-base/</link><guid isPermaLink="true">https://massiveco.hu/library/damp-proofing-base/</guid><description>Moisture in the concrete and in the ground must not reach the steel structure directly.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Foundations and geotechnics</category></item><item><title>Deconstruction and recycling</title><link>https://massiveco.hu/library/deconstruction-recycling/</link><guid isPermaLink="true">https://massiveco.hu/library/deconstruction-recycling/</guid><description>A screwed steel frame can be taken apart, and steel can be remelted without loss of properties.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Applications and operation</category></item><item><title>Decoupling and resilient fixing</title><link>https://massiveco.hu/library/decoupling-resilient/</link><guid isPermaLink="true">https://massiveco.hu/library/decoupling-resilient/</guid><description>Decoupling means the two sides of the structure are not rigidly connected.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Building physics and build-ups</category></item><item><title>Deflection limits</title><link>https://massiveco.hu/library/deflection-limits/</link><guid isPermaLink="true">https://massiveco.hu/library/deflection-limits/</guid><description>Deflection is not a safety question but a serviceability one: a structure can carry the load and still move enough to be annoying or to damage the finishes.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>LGS structural design</category></item><item><title>Design by testing</title><link>https://massiveco.hu/library/design-by-testing/</link><guid isPermaLink="true">https://massiveco.hu/library/design-by-testing/</guid><description>The Eurocode allows capacity to be verified by testing instead of calculation.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>LGS structural design</category></item><item><title>Design working life</title><link>https://massiveco.hu/library/design-working-life/</link><guid isPermaLink="true">https://massiveco.hu/library/design-working-life/</guid><description>The design working life is the period the structure is designed for — for buildings typically several decades.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Actions and Eurocode</category></item><item><title>Designing for projects abroad</title><link>https://massiveco.hu/library/designing-abroad/</link><guid isPermaLink="true">https://massiveco.hu/library/designing-abroad/</guid><description>The Eurocodes apply throughout Europe, so the logic of the design does not change at a border.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Actions and Eurocode</category></item><item><title>Dimensional stability and moisture</title><link>https://massiveco.hu/library/dimensional-stability-moisture/</link><guid isPermaLink="true">https://massiveco.hu/library/dimensional-stability-moisture/</guid><description>Steel does not take up moisture, so it does not swell, shrink, warp or crack as it dries.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>LGS fundamentals and materials</category></item><item><title>Distortional buckling</title><link>https://massiveco.hu/library/distortional-buckling/</link><guid isPermaLink="true">https://massiveco.hu/library/distortional-buckling/</guid><description>Flange and lip rotate together while the web distorts — a failure mode of lipped cold-formed sections that is not obvious and ordinary restraint does not stop.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>LGS structural design</category></item><item><title>Why it is not drywall profile</title><link>https://massiveco.hu/library/drywall-profile-vs-structural/</link><guid isPermaLink="true">https://massiveco.hu/library/drywall-profile-vs-structural/</guid><description>Drywall profile is around 0.4-0.6 mm thick; structural thin-walled profiles start at 0.8 mm and typically run to 1.6 mm in houses.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>LGS fundamentals and materials</category></item><item><title>The effective cross-section</title><link>https://massiveco.hu/library/effective-width-method/</link><guid isPermaLink="true">https://massiveco.hu/library/effective-width-method/</guid><description>Design does not work with the whole cross-section but with the part that still works fully after buckling.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>LGS structural design</category></item><item><title>EN 1090 and execution classes</title><link>https://massiveco.hu/library/en-1090-execution/</link><guid isPermaLink="true">https://massiveco.hu/library/en-1090-execution/</guid><description>A separate standard governs the execution of steel structures, with execution classes. The class is specified by the designer.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Hot-rolled steel and mixed structures</category></item><item><title>Basis of design: EN 1990</title><link>https://massiveco.hu/library/en-1990-basis/</link><guid isPermaLink="true">https://massiveco.hu/library/en-1990-basis/</guid><description>What designing reliably means: which limit states to verify, how uncertainty is handled with partial factors, how load combinations are assembled.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Actions and Eurocode</category></item><item><title>The role of EN 1993-1-3</title><link>https://massiveco.hu/library/en-1993-1-3-overview/</link><guid isPermaLink="true">https://massiveco.hu/library/en-1993-1-3-overview/</guid><description>The part of Eurocode 3 for cold-formed sections: effective cross-section, distortional buckling and thin-sheet connections.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>LGS structural design</category></item><item><title>The logic of EN 1997</title><link>https://massiveco.hu/library/en-1997-basics/</link><guid isPermaLink="true">https://massiveco.hu/library/en-1997-basics/</guid><description>The geotechnical Eurocode adapts limit states to the ground: uncertainty is greater, so testing and observation are part of the design.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Foundations and geotechnics</category></item><item><title>Energy performance certificate</title><link>https://massiveco.hu/library/energy-certificate/</link><guid isPermaLink="true">https://massiveco.hu/library/energy-certificate/</guid><description>Summarises a building’s energy performance; mandatory at occupancy, sale and letting. Not the same as the design energy calculation.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Building physics and build-ups</category></item><item><title>Energy performance requirements in Hungary</title><link>https://massiveco.hu/library/energy-requirements-hungary/</link><guid isPermaLink="true">https://massiveco.hu/library/energy-requirements-hungary/</guid><description>The energy performance of buildings is now governed by decree 9/2023 (V. 25.) ÉKM, which replaced the earlier 7/2006 TNM decree from November 2023.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Building physics and build-ups</category></item><item><title>EPD and life cycle assessment</title><link>https://massiveco.hu/library/epd-and-lca/</link><guid isPermaLink="true">https://massiveco.hu/library/epd-and-lca/</guid><description>An EPD reports a product’s environmental impacts in a standard way; life cycle assessment builds the building-level picture from them.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Applications and operation</category></item><item><title>Erection sequence</title><link>https://massiveco.hu/library/erection-sequence/</link><guid isPermaLink="true">https://massiveco.hu/library/erection-sequence/</guid><description>The frame is not finally stable until the bracing and the lining are complete.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Applications and operation</category></item><item><title>Actions and the Eurocode framework</title><link>https://massiveco.hu/library/eurocode-overview/</link><guid isPermaLink="true">https://massiveco.hu/library/eurocode-overview/</guid><description>Where the actions come from and in what system we design: the Eurocodes, the national annex, and what changes when designing abroad.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Actions and Eurocode</category></item><item><title>What the Eurocodes consist of</title><link>https://massiveco.hu/library/eurocode-structure/</link><guid isPermaLink="true">https://massiveco.hu/library/eurocode-structure/</guid><description>The European system of structural design standards: EN 1990 the basis, EN 1991 the actions, the further parts the design rules by material.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Actions and Eurocode</category></item><item><title>Façade build-ups</title><link>https://massiveco.hu/library/facade-buildups/</link><guid isPermaLink="true">https://massiveco.hu/library/facade-buildups/</guid><description>Three kinds of façade can go onto a framed structure: a rendered system, a ventilated cladding, or a wet-dry combination.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Building physics and build-ups</category></item><item><title>In-process quality control</title><link>https://massiveco.hu/library/factory-quality-control/</link><guid isPermaLink="true">https://massiveco.hu/library/factory-quality-control/</guid><description>Thin-walled capacity depends on cross-section accuracy: in-process measurement proves the installed section is the one the calculation used.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Manufacturing and machines</category></item><item><title>Financing and insurance</title><link>https://massiveco.hu/library/financing-and-insurance/</link><guid isPermaLink="true">https://massiveco.hu/library/financing-and-insurance/</guid><description>Some banks ask for an NMÉ at lending assessment for a steel-framed house, which is not a legal requirement but the bank&apos;s internal rule.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Applications and operation</category></item><item><title>What you can hang on the wall</title><link>https://massiveco.hu/library/fixing-to-lgs-walls/</link><guid isPermaLink="true">https://massiveco.hu/library/fixing-to-lgs-walls/</guid><description>Anything — the only question is where. The capacity is at the studs and at the built-in noggings; a fixing into the board will take pictures and shelves.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Applications and operation</category></item><item><title>Flexural-torsional buckling</title><link>https://massiveco.hu/library/flexural-torsional-buckling/</link><guid isPermaLink="true">https://massiveco.hu/library/flexural-torsional-buckling/</guid><description>An open, asymmetric section in compression twists as it buckles, because the shear centre is off the centroid — one reason restraint matters so much.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>LGS structural design</category></item><item><title>Floor build-ups: dry and wet</title><link>https://massiveco.hu/library/floor-buildups/</link><guid isPermaLink="true">https://massiveco.hu/library/floor-buildups/</guid><description>Two routes, differing in mass: the cheaper floating floor with a dry system, or the better floor on dovetail steel decking.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Building physics and build-ups</category></item><item><title>Floor joists</title><link>https://massiveco.hu/library/floor-joists/</link><guid isPermaLink="true">https://massiveco.hu/library/floor-joists/</guid><description>Capacity is rarely the bottleneck when sizing a floor joist: deflection and vibration decide.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>LGS structural design</category></item><item><title>Floor vibration and serviceability</title><link>https://massiveco.hu/library/floor-vibration/</link><guid isPermaLink="true">https://massiveco.hu/library/floor-vibration/</guid><description>Because a light floor has little mass, its response to footfall is more noticeable than that of a concrete floor.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>LGS structural design</category></item><item><title>Foundation options for a light building</title><link>https://massiveco.hu/library/foundation-options-light/</link><guid isPermaLink="true">https://massiveco.hu/library/foundation-options-light/</guid><description>Strip footing, raft slab, pads with ground beams or ground screws — each has its place.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Foundations and geotechnics</category></item><item><title>Foundations and geotechnics</title><link>https://massiveco.hu/library/foundations-overview/</link><guid isPermaLink="true">https://massiveco.hu/library/foundations-overview/</guid><description>A light structure puts little load on the foundation, so the foundation is often simpler and cheaper — but not automatically.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Foundations and geotechnics</category></item><item><title>Auto-gauging: mixed thicknesses</title><link>https://massiveco.hu/library/framecad-auto-gauging/</link><guid isPermaLink="true">https://massiveco.hu/library/framecad-auto-gauging/</guid><description>The auto-gauging system adjusts the forming stations to the steel thickness, so the same machine works between 0.55 and 1.20 mm without changeover.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>FRAMECAD system</category></item><item><title>The FRAMECAD system and the BIM environment</title><link>https://massiveco.hu/library/framecad-bim-integration/</link><guid isPermaLink="true">https://massiveco.hu/library/framecad-bim-integration/</guid><description>The frame model can be exchanged two-way with Revit, and through IFC with any BIM tool.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>FRAMECAD system</category></item><item><title>Design freedom in the FRAMECAD system</title><link>https://massiveco.hu/library/framecad-design-freedom/</link><guid isPermaLink="true">https://massiveco.hu/library/framecad-design-freedom/</guid><description>Not because the machine can do more, but because the engineering sits inside the design model: any geometry can be checked, not only the cases in a catalogue.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>FRAMECAD system</category></item><item><title>Which codes FRAMECAD calculates to</title><link>https://massiveco.hu/library/framecad-engineering-codes/</link><guid isPermaLink="true">https://massiveco.hu/library/framecad-engineering-codes/</guid><description>For Europe, Steelwise calculates to the Eurocodes: EN 1990, EN 1993-1-3, EN 1998-1 — no back-conversion from a foreign design system.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>FRAMECAD system</category></item><item><title>What the system exports: RFY, CSV, IFC</title><link>https://massiveco.hu/library/framecad-export-formats/</link><guid isPermaLink="true">https://massiveco.hu/library/framecad-export-formats/</guid><description>Besides RFY, Steelwise exports CSV and XML, IFC, STP, PDF and XLSX. That is what really decides how closed the system is.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>FRAMECAD system</category></item><item><title>The FRAMECAD system in Hungarian practice</title><link>https://massiveco.hu/library/framecad-hungarian-practice/</link><guid isPermaLink="true">https://massiveco.hu/library/framecad-hungarian-practice/</guid><description>The machine and the software do not decide a building&apos;s legal category.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>FRAMECAD system</category></item><item><title>Quality control at the FRAMECAD machine</title><link>https://massiveco.hu/library/framecad-machine-quality-control/</link><guid isPermaLink="true">https://massiveco.hu/library/framecad-machine-quality-control/</guid><description>What to measure on the finished profile: length, dimples, flange and lip width, straightness, squareness — each affects how the structure behaves.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>FRAMECAD system</category></item><item><title>The FRAMECAD machine range</title><link>https://massiveco.hu/library/framecad-machine-range/</link><guid isPermaLink="true">https://massiveco.hu/library/framecad-machine-range/</guid><description>The models differ in how large a structure they carry: F325iT for 1–3 storeys, F450iT for 1–4, the larger ST machines for thicker steel.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>FRAMECAD system</category></item><item><title>Nexa and Factory2</title><link>https://massiveco.hu/library/framecad-nexa-factory2/</link><guid isPermaLink="true">https://massiveco.hu/library/framecad-nexa-factory2/</guid><description>Factory2 drives the machine, Nexa records projects and production jobs; between them travels the machine program from the design model.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>FRAMECAD system</category></item><item><title>Steelwise: detailing and engineering</title><link>https://massiveco.hu/library/framecad-steelwise/</link><guid isPermaLink="true">https://massiveco.hu/library/framecad-steelwise/</guid><description>FRAMECAD’s design software: frame layout and structural checking in one model, then the machine program and the material report.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>FRAMECAD system</category></item><item><title>The FRAMECAD system</title><link>https://massiveco.hu/library/framecad-system-overview/</link><guid isPermaLink="true">https://massiveco.hu/library/framecad-system-overview/</guid><description>FRAMECAD offers a closed chain: design software, machine control, production management and a machine range in one system.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>FRAMECAD system</category></item><item><title>Tools and operations on FRAMECAD</title><link>https://massiveco.hu/library/framecad-tooling-operations/</link><guid isPermaLink="true">https://massiveco.hu/library/framecad-tooling-operations/</guid><description>The machine does not only cut and bend: the section also gets service holes, dimples, flange and lip forming, marking and connection preparation.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>FRAMECAD system</category></item><item><title>Where the system ties you in</title><link>https://massiveco.hu/library/framecad-vendor-lock-in/</link><guid isPermaLink="true">https://massiveco.hu/library/framecad-vendor-lock-in/</guid><description>FRAMECAD is closed at the licence and machine-format level, but the data can be taken out — that difference decides the real risk.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>FRAMECAD system</category></item><item><title>Frost depth and frost heave</title><link>https://massiveco.hu/library/frost-depth/</link><guid isPermaLink="true">https://massiveco.hu/library/frost-depth/</guid><description>Freezing turns the water in the ground to ice, which expands — and that can lift the foundation.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Foundations and geotechnics</category></item><item><title>Material pairing and galvanic corrosion</title><link>https://massiveco.hu/library/galvanic-corrosion-contact/</link><guid isPermaLink="true">https://massiveco.hu/library/galvanic-corrosion-contact/</guid><description>When two different metals touch in the presence of moisture, the less noble one corrodes faster.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>LGS fundamentals and materials</category></item><item><title>Geotechnical categories</title><link>https://massiveco.hu/library/geotechnical-categories/</link><guid isPermaLink="true">https://massiveco.hu/library/geotechnical-categories/</guid><description>Eurocode 7 scales the depth of geotechnical investigation and design to the complexity of the task.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Foundations and geotechnics</category></item><item><title>The limits of ground screws</title><link>https://massiveco.hu/library/ground-screw-limits/</link><guid isPermaLink="true">https://massiveco.hu/library/ground-screw-limits/</guid><description>They do not work in every ground: in stony, rocky, heavily made or very soft layers, installation is either impossible or does not give reliable capacity.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Foundations and geotechnics</category></item><item><title>The principle of ground screws</title><link>https://massiveco.hu/library/ground-screw-principles/</link><guid isPermaLink="true">https://massiveco.hu/library/ground-screw-principles/</guid><description>A screwed steel element is driven into the ground, and its capacity comes from shaft friction and from the resistance of the soil beneath the helix or plate.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Foundations and geotechnics</category></item><item><title>Load testing and verification</title><link>https://massiveco.hu/library/helical-pile-testing/</link><guid isPermaLink="true">https://massiveco.hu/library/helical-pile-testing/</guid><description>The strongest verification of the capacity of pile-type foundation elements is a load test.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Foundations and geotechnics</category></item><item><title>Hold-down and uplift anchorage</title><link>https://massiveco.hu/library/hold-down-anchorage/</link><guid isPermaLink="true">https://massiveco.hu/library/hold-down-anchorage/</guid><description>An upward pull arises at the end of a shear wall and at the corners of a light building.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>LGS structural design</category></item><item><title>Hot-dip galvanising</title><link>https://massiveco.hu/library/hot-dip-galvanising/</link><guid isPermaLink="true">https://massiveco.hu/library/hot-dip-galvanising/</guid><description>The finished steel member is dipped in molten zinc, giving durable, self-healing corrosion protection.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Hot-rolled steel and mixed structures</category></item><item><title>Hot-rolled sections: the basics</title><link>https://massiveco.hu/library/hot-rolled-basics/</link><guid isPermaLink="true">https://massiveco.hu/library/hot-rolled-basics/</guid><description>Stocky hot-rolled sections are limited by material strength, not plate stability: simpler design and more capacity, at more self-weight.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Hot-rolled steel and mixed structures</category></item><item><title>Hot-rolled steel and mixed structures</title><link>https://massiveco.hu/library/hrs-overview/</link><guid isPermaLink="true">https://massiveco.hu/library/hrs-overview/</guid><description>When thin-walled steel needs hot-rolled steelwork alongside it, how the two work together, and what to know about welding and composite floors.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Hot-rolled steel and mixed structures</category></item><item><title>Impact sound insulation</title><link>https://massiveco.hu/library/impact-sound/</link><guid isPermaLink="true">https://massiveco.hu/library/impact-sound/</guid><description>Impact sound travels through the structure, so the answer is decoupling: a floating floor or resilient layer — though without mass it is limited.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Building physics and build-ups</category></item><item><title>Insulation materials in the frame</title><link>https://massiveco.hu/library/insulation-materials/</link><guid isPermaLink="true">https://massiveco.hu/library/insulation-materials/</guid><description>Four things decide: thermal performance per thickness, fire class, behaviour in moisture, and how completely it fills the frame.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Building physics and build-ups</category></item><item><title>Marking and erection logic</title><link>https://massiveco.hu/library/labelling-and-assembly/</link><guid isPermaLink="true">https://massiveco.hu/library/labelling-and-assembly/</guid><description>Every member gets an ID telling where it goes. With mixed thicknesses a swapped member breaks the design, invisibly in the finished wall.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Manufacturing and machines</category></item><item><title>Later alterations</title><link>https://massiveco.hu/library/later-alterations/</link><guid isPermaLink="true">https://massiveco.hu/library/later-alterations/</guid><description>A framed structure adapts well if you know what is where: is the wall load-bearing, part of the bracing, and what runs inside it.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Applications and operation</category></item><item><title>Restraint and restraint points</title><link>https://massiveco.hu/library/lateral-restraint/</link><guid isPermaLink="true">https://massiveco.hu/library/lateral-restraint/</guid><description>The capacity of a thin-walled member is not a property of the member but of the member and its restraint together.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>LGS structural design</category></item><item><title>LGS fundamentals and materials</title><link>https://massiveco.hu/library/lgs-basics-overview/</link><guid isPermaLink="true">https://massiveco.hu/library/lgs-basics-overview/</guid><description>What a thin-walled steel frame is made of and how: steel, coating, sections, and how it behaves differently from hot-rolled steel or timber.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>LGS fundamentals and materials</category></item><item><title>The role of LGS design software</title><link>https://massiveco.hu/library/lgs-design-software/</link><guid isPermaLink="true">https://massiveco.hu/library/lgs-design-software/</guid><description>LGS design software does three things in one model: sets out the frame, checks it member by member, and produces the manufacturing output.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Manufacturing and machines</category></item><item><title>Where the technology came from</title><link>https://massiveco.hu/library/lgs-history-and-spread/</link><guid isPermaLink="true">https://massiveco.hu/library/lgs-history-and-spread/</guid><description>Structural cold-formed steel began mid-20th century and spread first where timber framing was the culture. Europe followed later.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>LGS fundamentals and materials</category></item><item><title>Glossary</title><link>https://massiveco.hu/library/lgs-terminology/</link><guid isPermaLink="true">https://massiveco.hu/library/lgs-terminology/</guid><description>LGS and CFS mean the same, lightweight construction is broader, framing is the method — plus the design and production terms in brief.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>LGS fundamentals and materials</category></item><item><title>Load-bearing and non-load-bearing walls</title><link>https://massiveco.hu/library/load-bearing-vs-partition/</link><guid isPermaLink="true">https://massiveco.hu/library/load-bearing-vs-partition/</guid><description>In a light gauge steel building you cannot tell the two apart by looking: both are steel sections and lining.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>LGS structural design</category></item><item><title>Load path continuity</title><link>https://massiveco.hu/library/load-path-continuity/</link><guid isPermaLink="true">https://massiveco.hu/library/load-path-continuity/</guid><description>Every load has to be taken from the roof to the foundation without a break.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>LGS structural design</category></item><item><title>Local buckling</title><link>https://massiveco.hu/library/local-buckling/</link><guid isPermaLink="true">https://massiveco.hu/library/local-buckling/</guid><description>Under compression the plate element ripples while the bends and edges stay in place.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>LGS structural design</category></item><item><title>Long-span solutions</title><link>https://massiveco.hu/library/long-span-solutions/</link><guid isPermaLink="true">https://massiveco.hu/library/long-span-solutions/</guid><description>As the span grows, the structural depth and the quantity of material grow fast.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Hot-rolled steel and mixed structures</category></item><item><title>What to know about a machine</title><link>https://massiveco.hu/library/machine-capability-survey/</link><guid isPermaLink="true">https://massiveco.hu/library/machine-capability-survey/</guid><description>An unfamiliar machine is surveyed before design: profiles, thickness, punching, service holes, maximum length — which becomes its template.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Manufacturing and machines</category></item><item><title>Cutting, punching, marking</title><link>https://massiveco.hu/library/machine-operations/</link><guid isPermaLink="true">https://massiveco.hu/library/machine-operations/</guid><description>The machine does more than cut to length: it punches service holes, makes dimples at screw points, cuts connection details and marks the part.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Manufacturing and machines</category></item><item><title>The logic of machine program formats</title><link>https://massiveco.hu/library/machine-program-formats/</link><guid isPermaLink="true">https://massiveco.hu/library/machine-program-formats/</guid><description>Practically every production line works from CSV: a simple, text-based, tabular format that almost every LGS design tool can produce.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Manufacturing and machines</category></item><item><title>The machine does not get a drawing</title><link>https://massiveco.hu/library/machine-program-vs-drawing/</link><guid isPermaLink="true">https://massiveco.hu/library/machine-program-vs-drawing/</guid><description>The line receives a file, not a drawing: per member, where to cut and punch and to what length. On an LGS project that file is the real output.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Manufacturing and machines</category></item><item><title>The machine-specific template</title><link>https://massiveco.hu/library/machine-specific-templates/</link><guid isPermaLink="true">https://massiveco.hu/library/machine-specific-templates/</guid><description>Each machine has its own profiles, tooling and limits, held in a template used for every later project — making program issue repeatable.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Manufacturing and machines</category></item><item><title>Machine types in general</title><link>https://massiveco.hu/library/machine-types-overview/</link><guid isPermaLink="true">https://massiveco.hu/library/machine-types-overview/</guid><description>Machines differ in two ways: one fixed profile or an adjustable range, and the thickness and structural load they target.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Manufacturing and machines</category></item><item><title>Maintenance and service life</title><link>https://massiveco.hu/library/maintenance-durability/</link><guid isPermaLink="true">https://massiveco.hu/library/maintenance-durability/</guid><description>The structure is maintenance-free if it stays dry. What needs maintaining is its protection: drainage, façade, roof, seals, ventilation.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Applications and operation</category></item><item><title>Manufacturing and machines</title><link>https://massiveco.hu/library/manufacturing-overview/</link><guid isPermaLink="true">https://massiveco.hu/library/manufacturing-overview/</guid><description>How a coil becomes a frame member: roll forming, what the machine needs from the designer, and site frame, panel or module.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Manufacturing and machines</category></item><item><title>Manufacturing tolerances on site</title><link>https://massiveco.hu/library/manufacturing-tolerances/</link><guid isPermaLink="true">https://massiveco.hu/library/manufacturing-tolerances/</guid><description>Machine production is far more accurate than traditional building, so the problem surfaces in the substrate: tolerance is about the adjoining structure.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Manufacturing and machines</category></item><item><title>Mould risk</title><link>https://massiveco.hu/library/mould-risk/</link><guid isPermaLink="true">https://massiveco.hu/library/mould-risk/</guid><description>Mould is not a question of cleanliness but of physics: it arises where a cold surface meets vapour.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Building physics and build-ups</category></item><item><title>The national annex</title><link>https://massiveco.hu/library/national-annex/</link><guid isPermaLink="true">https://massiveco.hu/library/national-annex/</guid><description>The Eurocodes leave nationally determined parameters open: zone maps, factor values, selectable procedures.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Actions and Eurocode</category></item><item><title>Cutting optimisation and waste</title><link>https://massiveco.hu/library/nesting-and-waste/</link><guid isPermaLink="true">https://massiveco.hu/library/nesting-and-waste/</guid><description>The profile is produced continuously from coil, so waste arises mainly at cutting and from defective members.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Manufacturing and machines</category></item><item><title>Non-residential buildings</title><link>https://massiveco.hu/library/non-residential-applications/</link><guid isPermaLink="true">https://massiveco.hu/library/non-residential-applications/</guid><description>Offices, education and healthcare buildings, hotels, ancillary industrial buildings, modular units.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Applications and operation</category></item><item><title>Nearly zero-energy buildings</title><link>https://massiveco.hu/library/nzeb/</link><guid isPermaLink="true">https://massiveco.hu/library/nzeb/</guid><description>The nearly zero-energy level means the building has a very low energy demand and covers a significant part of it from renewable sources.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Building physics and build-ups</category></item><item><title>Openings and lintels</title><link>https://massiveco.hu/library/openings-and-lintels/</link><guid isPermaLink="true">https://massiveco.hu/library/openings-and-lintels/</guid><description>An opening interrupts the load path, so the load above it has to be carried to the side of the opening by a lintel and taken down there by a reinforced stud.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>LGS structural design</category></item><item><title>Organic and absorbent materials in the wall</title><link>https://massiveco.hu/library/organic-materials-in-walls/</link><guid isPermaLink="true">https://massiveco.hu/library/organic-materials-in-walls/</guid><description>No water-absorbing organic material goes into an external wall — not OSB, not gypsum-based board.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Building physics and build-ups</category></item><item><title>Clinching, riveting and welding thin sheet</title><link>https://massiveco.hu/library/other-connection-types/</link><guid isPermaLink="true">https://massiveco.hu/library/other-connection-types/</guid><description>Besides screws: clinching with no fastener, blind rivets with one-sided access, and welding thin sheet, which is rarely justified.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>LGS structural design</category></item><item><title>Pads and ground beams</title><link>https://massiveco.hu/library/pad-and-grade-beam/</link><guid isPermaLink="true">https://massiveco.hu/library/pad-and-grade-beam/</guid><description>Point foundations with ground beams between them: little concrete and little excavation, often economic for a light structure.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Foundations and geotechnics</category></item><item><title>Panel size and transport</title><link>https://massiveco.hu/library/panel-size-and-transport/</link><guid isPermaLink="true">https://massiveco.hu/library/panel-size-and-transport/</guid><description>Panel size is rarely limited by the structure: it is limited by transportability, lifting and moving on site.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Manufacturing and machines</category></item><item><title>Partial factors and load combinations</title><link>https://massiveco.hu/library/partial-factors-combinations/</link><guid isPermaLink="true">https://massiveco.hu/library/partial-factors-combinations/</guid><description>Each action gets its own factor, and combinations reflect that not all actions peak at once. The governing combination differs by member.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Actions and Eurocode</category></item><item><title>Party walls</title><link>https://massiveco.hu/library/party-wall-acoustics/</link><guid isPermaLink="true">https://massiveco.hu/library/party-wall-acoustics/</guid><description>In brick the party wall has to be doubled from the outset, which takes a lot of room.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Building physics and build-ups</category></item><item><title>The logic of portal frame halls</title><link>https://massiveco.hu/library/portal-frame-halls/</link><guid isPermaLink="true">https://massiveco.hu/library/portal-frame-halls/</guid><description>A hall of portal frames, purlins and bracing is the classic solution for large, column-free spaces.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Hot-rolled steel and mixed structures</category></item><item><title>Capacity and lead time</title><link>https://massiveco.hu/library/production-capacity/</link><guid isPermaLink="true">https://massiveco.hu/library/production-capacity/</guid><description>The nominal speed of a production line is rarely the bottleneck: real lead time is set by material supply, profile changeovers, assembly and logistics.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Manufacturing and machines</category></item><item><title>What an LGS production line does</title><link>https://massiveco.hu/library/production-line-anatomy/</link><guid isPermaLink="true">https://massiveco.hu/library/production-line-anatomy/</guid><description>The line does four things in sequence: decoils and levels, forms, performs operations on the section, then cuts to length.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Manufacturing and machines</category></item><item><title>Section depth and thickness</title><link>https://massiveco.hu/library/profile-dimensions-ranges/</link><guid isPermaLink="true">https://massiveco.hu/library/profile-dimensions-ranges/</guid><description>In residential buildings profile thickness typically runs between 0.8 and 1.6 mm, and section depth from a few centimetres up to floor joist depths.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>LGS fundamentals and materials</category></item><item><title>Radon protection</title><link>https://massiveco.hu/library/radon-protection/</link><guid isPermaLink="true">https://massiveco.hu/library/radon-protection/</guid><description>Radon is a natural radioactive gas rising from the ground that can build up in an enclosed interior.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Foundations and geotechnics</category></item><item><title>Raft slab</title><link>https://massiveco.hu/library/raft-slab/</link><guid isPermaLink="true">https://massiveco.hu/library/raft-slab/</guid><description>A continuous reinforced concrete slab under the whole building, spreading the load evenly.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Foundations and geotechnics</category></item><item><title>Renovation and extension</title><link>https://massiveco.hu/library/renovation-and-extension/</link><guid isPermaLink="true">https://massiveco.hu/library/renovation-and-extension/</guid><description>When adding to an existing building, a light structure gives two things: little additional load and dry, fast construction.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Applications and operation</category></item><item><title>Residential buildings</title><link>https://massiveco.hu/library/residential-applications/</link><guid isPermaLink="true">https://massiveco.hu/library/residential-applications/</guid><description>From houses to apartment buildings: for housing the technology is strongest where wall thickness, sound insulation and durability all matter together.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Applications and operation</category></item><item><title>Accidental actions and robustness</title><link>https://massiveco.hu/library/robustness-accidental/</link><guid isPermaLink="true">https://massiveco.hu/library/robustness-accidental/</guid><description>Robustness means that local damage does not cause disproportionate collapse.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Actions and Eurocode</category></item><item><title>Roll forming: how coil becomes a section</title><link>https://massiveco.hu/library/roll-forming-basics/</link><guid isPermaLink="true">https://massiveco.hu/library/roll-forming-basics/</guid><description>The sheet passes between successive pairs of rollers, each station bending it a little closer to the final shape.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Manufacturing and machines</category></item><item><title>Trusses</title><link>https://massiveco.hu/library/roof-trusses/</link><guid isPermaLink="true">https://massiveco.hu/library/roof-trusses/</guid><description>Trusses are a strength of the technology: the machine cuts the web members, so angles become feasible that would be costly to cut by hand.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>LGS structural design</category></item><item><title>Self-drilling screw connections</title><link>https://massiveco.hu/library/screw-connections/</link><guid isPermaLink="true">https://massiveco.hu/library/screw-connections/</guid><description>In a thin-walled structure the connection fails not in the screw but in the sheet: as bearing, pull-out or tear-out.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>LGS structural design</category></item><item><title>The second-generation Eurocodes</title><link>https://massiveco.hu/library/second-generation-eurocodes/</link><guid isPermaLink="true">https://massiveco.hu/library/second-generation-eurocodes/</guid><description>Revised editions of the Eurocodes are appearing gradually and will live alongside the earlier ones for years.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Actions and Eurocode</category></item><item><title>Section types and what they are for</title><link>https://massiveco.hu/library/section-profiles-c-u-sigma/</link><guid isPermaLink="true">https://massiveco.hu/library/section-profiles-c-u-sigma/</guid><description>A few basic sections: lipped C for studs and joists, U for tracks, stiffened webs for longer spans. The shape is a stability question.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>LGS fundamentals and materials</category></item><item><title>Seismic design in the Hungarian context</title><link>https://massiveco.hu/library/seismic-design-hungary/</link><guid isPermaLink="true">https://massiveco.hu/library/seismic-design-hungary/</guid><description>The force from an earthquake is proportional to mass, so it is substantially smaller for a light gauge steel building than for a heavy structure.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Actions and Eurocode</category></item><item><title>Self-weight and imposed load</title><link>https://massiveco.hu/library/self-weight-imposed/</link><guid isPermaLink="true">https://massiveco.hu/library/self-weight-imposed/</guid><description>The self-weight of a light gauge steel building is a fraction of a masonry or in-situ structure&apos;s.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Actions and Eurocode</category></item><item><title>The service cavity</title><link>https://massiveco.hu/library/service-cavity/</link><guid isPermaLink="true">https://massiveco.hu/library/service-cavity/</guid><description>Services run not in the structure but in a battened plane inside the vapour control membrane: 30–40 mm, and the membrane stays intact.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Building physics and build-ups</category></item><item><title>Serviceability criteria</title><link>https://massiveco.hu/library/serviceability-criteria/</link><guid isPermaLink="true">https://massiveco.hu/library/serviceability-criteria/</guid><description>Deflection, vibration and cracking are the three characteristics the user actually perceives.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Actions and Eurocode</category></item><item><title>Setting out and foundation tolerances</title><link>https://massiveco.hu/library/setting-out-tolerances/</link><guid isPermaLink="true">https://massiveco.hu/library/setting-out-tolerances/</guid><description>A machine-accurate frame needs an accurate base: foundation deviations accumulate in erection, so the survey comes before the panels arrive.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Foundations and geotechnics</category></item><item><title>Designing a shear wall</title><link>https://massiveco.hu/library/shear-wall-design/</link><guid isPermaLink="true">https://massiveco.hu/library/shear-wall-design/</guid><description>A shear wall resists horizontal load and takes it down into the foundation.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>LGS structural design</category></item><item><title>Sheathing diaphragm</title><link>https://massiveco.hu/library/sheathing-diaphragm/</link><guid isPermaLink="true">https://massiveco.hu/library/sheathing-diaphragm/</guid><description>Board screw-fixed to the sections is very stiff in its own plane, so the lining of a wall, floor or roof can act as bracing.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>LGS structural design</category></item><item><title>Inspection points</title><link>https://massiveco.hu/library/site-inspection-points/</link><guid isPermaLink="true">https://massiveco.hu/library/site-inspection-points/</guid><description>Inspection counts before covering. Four stops: foundation survey, frame complete, before closing the vapour control, before lining.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Applications and operation</category></item><item><title>Slab edge: thermal bridge and insulation</title><link>https://massiveco.hu/library/slab-edge-thermal-bridge/</link><guid isPermaLink="true">https://massiveco.hu/library/slab-edge-thermal-bridge/</guid><description>The lowest junction of the building is one of the largest thermal bridges: it is where the insulated wall meets the cold foundation and the ground.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Foundations and geotechnics</category></item><item><title>Snow load in Hungary</title><link>https://massiveco.hu/library/snow-load-hungary/</link><guid isPermaLink="true">https://massiveco.hu/library/snow-load-hungary/</guid><description>Snow is a governing roof action, set by location, roof form and drifting — and drifting is what is most often underestimated.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Actions and Eurocode</category></item><item><title>The ground investigation report</title><link>https://massiveco.hu/library/soil-investigation/</link><guid isPermaLink="true">https://massiveco.hu/library/soil-investigation/</guid><description>The ground investigation report says what ground we are building on: stratigraphy, bearing capacity, water table, swelling layers.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Foundations and geotechnics</category></item><item><title>How steel behaves with temperature</title><link>https://massiveco.hu/library/steel-behaviour-temperature/</link><guid isPermaLink="true">https://massiveco.hu/library/steel-behaviour-temperature/</guid><description>Steel expands and loses strength when hot, and can become more brittle when cold.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>LGS fundamentals and materials</category></item><item><title>Where steel meets concrete</title><link>https://massiveco.hu/library/steel-concrete-interface/</link><guid isPermaLink="true">https://massiveco.hu/library/steel-concrete-interface/</guid><description>Where steelwork connects to concrete, three questions have to be handled at once: the load transfer, the difference in tolerances and corrosion.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Hot-rolled steel and mixed structures</category></item><item><title>Steel grades for framing</title><link>https://massiveco.hu/library/steel-grades-for-framing/</link><guid isPermaLink="true">https://massiveco.hu/library/steel-grades-for-framing/</guid><description>Framing profiles are made from continuously galvanised steel coil, designated to EN 10346: the number gives the yield strength, the letters the coating.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>LGS fundamentals and materials</category></item><item><title>Steel as a circular material</title><link>https://massiveco.hu/library/steel-recycled-content/</link><guid isPermaLink="true">https://massiveco.hu/library/steel-recycled-content/</guid><description>Steel can be remelted without loss of properties, and demolished steel returns almost entirely to the material stream.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>LGS fundamentals and materials</category></item><item><title>Steel and timber framing</title><link>https://massiveco.hu/library/steel-vs-timber-frame/</link><guid isPermaLink="true">https://massiveco.hu/library/steel-vs-timber-frame/</guid><description>Both are framed, with similar build-ups; the materials differ in moisture, fire and heat conduction. The project decides, not the material.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>LGS fundamentals and materials</category></item><item><title>Site-erected frame, panel, module</title><link>https://massiveco.hu/library/stick-panel-modular/</link><guid isPermaLink="true">https://massiveco.hu/library/stick-panel-modular/</guid><description>The same production can lead to three building methods: a frame assembled on site, panels assembled in the plant, and complete volumetric modules.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Manufacturing and machines</category></item><item><title>Strip footings</title><link>https://massiveco.hu/library/strip-foundation/</link><guid isPermaLink="true">https://massiveco.hu/library/strip-foundation/</guid><description>A continuous footing under the walls. For a light structure its size is set more by frost depth and buildability than by bearing capacity.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Foundations and geotechnics</category></item><item><title>LGS structural design</title><link>https://massiveco.hu/library/structural-design-overview/</link><guid isPermaLink="true">https://massiveco.hu/library/structural-design-overview/</guid><description>How a thin-walled steel frame is engineered: why stability governs, how wall, floor and bracing work, and why connections decide quality.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>LGS structural design</category></item><item><title>What structural software is for</title><link>https://massiveco.hu/library/structural-software-role/</link><guid isPermaLink="true">https://massiveco.hu/library/structural-software-role/</guid><description>The software calculates, the engineer is responsible. The result depends on the input: the common mistakes are modelling, not calculation.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>LGS structural design</category></item><item><title>The wall panel as a structure</title><link>https://massiveco.hu/library/stud-wall-as-structure/</link><guid isPermaLink="true">https://massiveco.hu/library/stud-wall-as-structure/</guid><description>A wall panel is a co-operating system: studs carry vertical load, tracks tie them, lining and bracing give stability and take horizontal load.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>LGS structural design</category></item><item><title>Summer overheating and thermal mass</title><link>https://massiveco.hu/library/summer-overheating/</link><guid isPermaLink="true">https://massiveco.hu/library/summer-overheating/</guid><description>A light structure has little thermal storage mass, so the internal temperature follows the external one more closely.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Building physics and build-ups</category></item><item><title>Surface protection systems</title><link>https://massiveco.hu/library/surface-protection/</link><guid isPermaLink="true">https://massiveco.hu/library/surface-protection/</guid><description>Corrosion protection starts from the environment and the design life. Painting is a system: primer, intermediate coat and topcoat.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Hot-rolled steel and mixed structures</category></item><item><title>Ways of breaking a thermal bridge</title><link>https://massiveco.hu/library/thermal-break-strategies/</link><guid isPermaLink="true">https://massiveco.hu/library/thermal-break-strategies/</guid><description>Three routes: continuous insulation outside the frame, a break layer between section and lining, or changed geometry. The first works best.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Building physics and build-ups</category></item><item><title>The steel thermal bridge</title><link>https://massiveco.hu/library/thermal-bridging-steel/</link><guid isPermaLink="true">https://massiveco.hu/library/thermal-bridging-steel/</guid><description>Steel conducts heat orders of magnitude better than timber or insulation.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Building physics and build-ups</category></item><item><title>Trial production</title><link>https://massiveco.hu/library/trial-production/</link><guid isPermaLink="true">https://massiveco.hu/library/trial-production/</guid><description>We follow the first run through and refine the program from what we see.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Manufacturing and machines</category></item><item><title>Calculating the U-value of a steel frame</title><link>https://massiveco.hu/library/u-value-steel-frame/</link><guid isPermaLink="true">https://massiveco.hu/library/u-value-steel-frame/</guid><description>Simply adding up the layers gives a misleading result for a steel frame, because the sections interrupt the homogeneous layers.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Building physics and build-ups</category></item><item><title>Ultimate and serviceability limit states</title><link>https://massiveco.hu/library/uls-sls/</link><guid isPermaLink="true">https://massiveco.hu/library/uls-sls/</guid><description>The ultimate limit state concerns collapse of the structure, the serviceability limit state its normal use.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Actions and Eurocode</category></item><item><title>Resisting uplift in light structures</title><link>https://massiveco.hu/library/uplift-light-structures/</link><guid isPermaLink="true">https://massiveco.hu/library/uplift-light-structures/</guid><description>In a light building the upward force of wind suction can exceed the self-weight of the structure.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Foundations and geotechnics</category></item><item><title>The principle of vapour control</title><link>https://massiveco.hu/library/vapour-control/</link><guid isPermaLink="true">https://massiveco.hu/library/vapour-control/</guid><description>In light gauge steel construction vapour control is done solely by the membrane.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Building physics and build-ups</category></item><item><title>Rooftop additions in light gauge steel</title><link>https://massiveco.hu/library/vertical-extension/</link><guid isPermaLink="true">https://massiveco.hu/library/vertical-extension/</guid><description>The reserve capacity of an existing building is tight, so the key question in a rooftop addition is self-weight.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Hot-rolled steel and mixed structures</category></item><item><title>Bracing with steel straps</title><link>https://massiveco.hu/library/wall-bracing-straps/</link><guid isPermaLink="true">https://massiveco.hu/library/wall-bracing-straps/</guid><description>Diagonal steel strap is the simplest bracing solution: it works in tension, so it always goes in crossed pairs.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>LGS structural design</category></item><item><title>Comparing wall thicknesses</title><link>https://massiveco.hu/library/wall-thickness-comparison/</link><guid isPermaLink="true">https://massiveco.hu/library/wall-thickness-comparison/</guid><description>For the same thermal value an LGS wall is roughly half as thick as a traditional one — a gain you can measure in floor area.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Building physics and build-ups</category></item><item><title>Web holes and service openings</title><link>https://massiveco.hu/library/web-holes-services/</link><guid isPermaLink="true">https://massiveco.hu/library/web-holes-services/</guid><description>A hole cut in the web weakens the section, in shear above all — so its position and size are a design question.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>LGS structural design</category></item><item><title>Welded and bolted connections</title><link>https://massiveco.hu/library/welded-vs-bolted/</link><guid isPermaLink="true">https://massiveco.hu/library/welded-vs-bolted/</guid><description>Welding gives a rigid, continuous connection but demands quality control and skilled work.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Hot-rolled steel and mixed structures</category></item><item><title>Weld quality and inspection</title><link>https://massiveco.hu/library/welding-quality/</link><guid isPermaLink="true">https://massiveco.hu/library/welding-quality/</guid><description>The quality of a welded connection is not visible from outside: internal defects — cracks, lack of fusion, inclusions — only emerge through testing.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Hot-rolled steel and mixed structures</category></item><item><title>What LGS and lightweight construction are</title><link>https://massiveco.hu/library/what-is-light-gauge-steel/</link><guid isPermaLink="true">https://massiveco.hu/library/what-is-light-gauge-steel/</guid><description>LGS is a load-bearing structure built from sections cold-formed out of thin galvanised steel sheet.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>LGS fundamentals and materials</category></item><item><title>When HRS is needed alongside LGS</title><link>https://massiveco.hu/library/when-hrs-with-lgs/</link><guid isPermaLink="true">https://massiveco.hu/library/when-hrs-with-lgs/</guid><description>Long spans, concentrated loads, large transfer openings, and anywhere a thin-walled section would need a disproportionate number of members.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Hot-rolled steel and mixed structures</category></item><item><title>What it is not good for</title><link>https://massiveco.hu/library/where-lgs-is-not-the-answer/</link><guid isPermaLink="true">https://massiveco.hu/library/where-lgs-is-not-the-answer/</guid><description>Long-span, heavily loaded structures, cases where mass is a functional requirement, and anywhere the design and site discipline is not there.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Applications and operation</category></item><item><title>What light gauge steel is really good for</title><link>https://massiveco.hu/library/where-lgs-works-best/</link><guid isPermaLink="true">https://massiveco.hu/library/where-lgs-works-best/</guid><description>Choose it for two reasons: the wall delivers the same performance at half the thickness, and designed properly it outlasts most alternatives.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Applications and operation</category></item><item><title>Why thin-walled design differs</title><link>https://massiveco.hu/library/why-thin-walled-differs/</link><guid isPermaLink="true">https://massiveco.hu/library/why-thin-walled-differs/</guid><description>Because the plate elements lose stability before reaching the yield strength.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>LGS structural design</category></item><item><title>Wind barrier and breather membranes</title><link>https://massiveco.hu/library/wind-barrier-membranes/</link><guid isPermaLink="true">https://massiveco.hu/library/wind-barrier-membranes/</guid><description>The external membrane shields the insulation from wind and outside moisture while letting vapour out — the counterpart of the vapour control layer.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Building physics and build-ups</category></item><item><title>Wind load and terrain category</title><link>https://massiveco.hu/library/wind-load-terrain/</link><guid isPermaLink="true">https://massiveco.hu/library/wind-load-terrain/</guid><description>Wind does not only press, it sucks — and on a light building the suction often governs.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>Actions and Eurocode</category></item><item><title>Yield strength and thickness go together</title><link>https://massiveco.hu/library/yield-strength-and-thickness/</link><guid isPermaLink="true">https://massiveco.hu/library/yield-strength-and-thickness/</guid><description>Neither figure tells capacity alone: thickness drives stability and connections, yield strength the material — slenderness decides which governs.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>LGS fundamentals and materials</category></item><item><title>Zinc coating: what Z275 means</title><link>https://massiveco.hu/library/zinc-coating-classes/</link><guid isPermaLink="true">https://massiveco.hu/library/zinc-coating-classes/</guid><description>The number gives the coating mass per square metre, counting both faces together.</description><pubDate>Mon, 12 Oct 2026 22:41:48 GMT</pubDate><category>LGS fundamentals and materials</category></item><item><title>Assembly guide</title><link>https://massiveco.hu/assembly/</link><guid isPermaLink="true">https://massiveco.hu/assembly/</guid><description>On-site assembly guides for installers, with a permanent code and a version number, so drawings can refer to them.</description><pubDate>Mon, 12 Oct 2026 19:15:36 GMT</pubDate><category>Overview</category></item><item><title>SZ-01 Principles</title><link>https://massiveco.hu/assembly/sz-01/</link><guid isPermaLink="true">https://massiveco.hu/assembly/sz-01/</guid><description>What applies to every assembly: the drawing governs, any deviation only with the designer, and if something does not fit, ask rather than improvise.</description><pubDate>Mon, 12 Oct 2026 19:15:36 GMT</pubDate><category>Guides</category></item><item><title>SZ-02 Position numbers and position map</title><link>https://massiveco.hu/assembly/sz-02/</link><guid isPermaLink="true">https://massiveco.hu/assembly/sz-02/</guid><description>Every element has a unique position number, also on the manufactured profile; the position map shows where it goes.</description><pubDate>Mon, 12 Oct 2026 19:15:36 GMT</pubDate><category>Guides</category></item><item><title>SZ-03 Vapour control and services</title><link>https://massiveco.hu/assembly/sz-03/</link><guid isPermaLink="true">https://massiveco.hu/assembly/sz-03/</guid><description>The membrane alone is the vapour barrier; services do not run through the profiles but on battens on the membrane&apos;s inner side.</description><pubDate>Mon, 12 Oct 2026 19:15:36 GMT</pubDate><category>Guides</category></item><item><title>SZ-04 Build-up and cladding</title><link>https://massiveco.hu/assembly/sz-04/</link><guid isPermaLink="true">https://massiveco.hu/assembly/sz-04/</guid><description>The order of the build-up on the drawing is binding; whatever gives hardness goes in the outermost layer.</description><pubDate>Mon, 12 Oct 2026 19:15:36 GMT</pubDate><category>Guides</category></item><item><title>SZ-05 Lifting and pre-assembled units</title><link>https://massiveco.hu/assembly/sz-05/</link><guid isPermaLink="true">https://massiveco.hu/assembly/sz-05/</guid><description>Lifting points are part of the structural design; large elements are handled as factory-assembled, clad units.</description><pubDate>Mon, 12 Oct 2026 19:15:36 GMT</pubDate><category>Guides</category></item><item><title>Building in steel</title><link>https://massiveco.hu/building/</link><guid isPermaLink="true">https://massiveco.hu/building/</guid><description>Why light-gauge steel is the higher quality, what it can do, when it is worth it, and how a design becomes a structure.</description><pubDate>Mon, 12 Oct 2026 19:15:36 GMT</pubDate><category>Overview</category></item><item><title>From design to finished structure</title><link>https://massiveco.hu/building/design-to-structure/</link><guid isPermaLink="true">https://massiveco.hu/building/design-to-structure/</guid><description>How we put the technology into practice: architecture, structure, fabrication design, machine program, production, assembly — and who owns each step.</description><pubDate>Mon, 12 Oct 2026 19:15:36 GMT</pubDate><category>In practice</category></item><item><title>Hybrid structures: concrete, steel, timber</title><link>https://massiveco.hu/building/hybrid-structures/</link><guid isPermaLink="true">https://massiveco.hu/building/hybrid-structures/</guid><description>When light-gauge steel is combined with something else: a concrete core in taller buildings, hot-rolled steel for long spans, timber in extensions.</description><pubDate>Mon, 12 Oct 2026 19:15:36 GMT</pubDate><category>In practice</category></item><item><title>When steel is worth it, and when not</title><link>https://massiveco.hu/building/when-to-use/</link><guid isPermaLink="true">https://massiveco.hu/building/when-to-use/</guid><description>The building types where light-gauge steel is the better choice, and those where another structure or a hybrid is right.</description><pubDate>Mon, 12 Oct 2026 19:15:36 GMT</pubDate><category>In practice</category></item><item><title>Why a steel house is not a compromise</title><link>https://massiveco.hu/building/why-steel/</link><guid isPermaLink="true">https://massiveco.hu/building/why-steel/</guid><description>A light-gauge steel house is not a cheap stand-in but a more precise, thinner-walled and more predictable way to build. Where it is better, and what to watch.</description><pubDate>Mon, 12 Oct 2026 19:15:36 GMT</pubDate><category>Why steel</category></item><item><title>International case studies</title><link>https://massiveco.hu/library/international-cases/</link><guid isPermaLink="true">https://massiveco.hu/library/international-cases/</guid><description>Light-gauge steel buildings from around the world: houses, multi-storey buildings, industrial and public buildings — what they show about the technology.</description><pubDate>Mon, 12 Oct 2026 19:15:36 GMT</pubDate><category>International examples</category></item><item><title>Regulations and certification</title><link>https://massiveco.hu/regulations/</link><guid isPermaLink="true">https://massiveco.hu/regulations/</guid><description>The legal and fire-protection background of light-gauge steel: NMÉ, ETA, CE, fire protection, certifications, permits.</description><pubDate>Mon, 12 Oct 2026 19:15:36 GMT</pubDate><category>Overview</category></item><item><title>Certifications overview</title><link>https://massiveco.hu/regulations/certifications/</link><guid isPermaLink="true">https://massiveco.hu/regulations/certifications/</guid><description>Which certifications, assessments and declarations apply to a light-gauge steel building, who issues them, and what each proves.</description><pubDate>Mon, 12 Oct 2026 19:15:36 GMT</pubDate><category>Certification</category></item><item><title>Permitting</title><link>https://massiveco.hu/regulations/permitting/</link><guid isPermaLink="true">https://massiveco.hu/regulations/permitting/</guid><description>How a light-gauge steel building is permitted: which procedure, which documents, and what the authority asks about the structure.</description><pubDate>Mon, 12 Oct 2026 19:15:36 GMT</pubDate><category>Permits and checks</category></item><item><title>The target certificate</title><link>https://massiveco.hu/regulations/target-certificate/</link><guid isPermaLink="true">https://massiveco.hu/regulations/target-certificate/</guid><description>Which certification we are aiming for, what it proves, and where obtaining it stands.</description><pubDate>Mon, 12 Oct 2026 19:15:36 GMT</pubDate><category>Certification</category></item><item><title>Fabrication design: inputs</title><link>https://massiveco.hu/services/fabrication-inputs/</link><guid isPermaLink="true">https://massiveco.hu/services/fabrication-inputs/</guid><description>What we need to start fabrication design: a numbered list with formats, required and optional items. Can be sent as a link.</description><pubDate>Mon, 12 Oct 2026 19:01:10 GMT</pubDate><category>Fabrication design</category></item><item><title>Fabrication design: outputs</title><link>https://massiveco.hu/services/fabrication-outputs/</link><guid isPermaLink="true">https://massiveco.hu/services/fabrication-outputs/</guid><description>What fabrication design delivers: format and content, document by document.</description><pubDate>Mon, 12 Oct 2026 19:01:10 GMT</pubDate><category>Fabrication design</category></item><item><title>General design: inputs</title><link>https://massiveco.hu/services/general-inputs/</link><guid isPermaLink="true">https://massiveco.hu/services/general-inputs/</guid><description>What we need to start general design: a numbered list with formats, required and optional items. Can be sent as a link.</description><pubDate>Mon, 12 Oct 2026 19:01:10 GMT</pubDate><category>General design</category></item><item><title>General design: outputs</title><link>https://massiveco.hu/services/general-outputs/</link><guid isPermaLink="true">https://massiveco.hu/services/general-outputs/</guid><description>What general design delivers: format and content, document by document.</description><pubDate>Mon, 12 Oct 2026 19:01:10 GMT</pubDate><category>General design</category></item><item><title>Preparation and management: inputs</title><link>https://massiveco.hu/services/management-inputs/</link><guid isPermaLink="true">https://massiveco.hu/services/management-inputs/</guid><description>What we need to start preparation and management: a numbered list with formats, required and optional items. Can be sent as a link.</description><pubDate>Mon, 12 Oct 2026 19:01:10 GMT</pubDate><category>Preparation and management</category></item><item><title>Preparation and management: outputs</title><link>https://massiveco.hu/services/management-outputs/</link><guid isPermaLink="true">https://massiveco.hu/services/management-outputs/</guid><description>What preparation and management delivers: format and content, document by document.</description><pubDate>Mon, 12 Oct 2026 19:01:10 GMT</pubDate><category>Preparation and management</category></item><item><title>Structural design package: inputs</title><link>https://massiveco.hu/services/structural-inputs/</link><guid isPermaLink="true">https://massiveco.hu/services/structural-inputs/</guid><description>What we need to start structural design package: a numbered list with formats, required and optional items. Can be sent as a link.</description><pubDate>Mon, 12 Oct 2026 19:01:10 GMT</pubDate><category>Structural design package</category></item><item><title>Structural design package: outputs</title><link>https://massiveco.hu/services/structural-outputs/</link><guid isPermaLink="true">https://massiveco.hu/services/structural-outputs/</guid><description>What structural design package delivers: format and content, document by document.</description><pubDate>Mon, 12 Oct 2026 19:01:10 GMT</pubDate><category>Structural design package</category></item><item><title>What types of buildings do you design?</title><link>https://massiveco.hu/building/building-types/</link><guid isPermaLink="true">https://massiveco.hu/building/building-types/</guid><description>Steel, LGS and timber, from family homes to shopping centres. Our references include cultural, sports, educational and industrial buildings and a pool.</description><pubDate>Mon, 12 Oct 2026 16:35:07 GMT</pubDate><category>Materials and feasibility</category></item><item><title>Can you design curved or inclined forms?</title><link>https://massiveco.hu/building/curved-geometry/</link><guid isPermaLink="true">https://massiveco.hu/building/curved-geometry/</guid><description>The dojo roof shows exactly this. Machines cut the trusses, so angles and lattices that would be costly to cut by hand in hot-rolled steel are possible.</description><pubDate>Mon, 12 Oct 2026 16:35:07 GMT</pubDate><category>Materials and feasibility</category></item><item><title>LGS build-ups: acoustics, vapour, services</title><link>https://massiveco.hu/building/lgs-build-ups/</link><guid isPermaLink="true">https://massiveco.hu/building/lgs-build-ups/</guid><description>Every material can be built well or badly — masonry walls can sound poor too. What decides is the build-up and the execution. Walls, floors, services.</description><pubDate>Mon, 12 Oct 2026 16:35:07 GMT</pubDate><category>In practice</category></item><item><title>Materials: which one for what</title><link>https://massiveco.hu/building/materials/</link><guid isPermaLink="true">https://massiveco.hu/building/materials/</guid><description>Light-gauge steel, hot-rolled steel, timber and hybrid structures compared — what each is good for, and what we do not take on.</description><pubDate>Mon, 12 Oct 2026 16:35:07 GMT</pubDate><category>Materials and feasibility</category></item><item><title>Why choose light-gauge steel?</title><link>https://massiveco.hu/building/why-lgs/</link><guid isPermaLink="true">https://massiveco.hu/building/why-lgs/</guid><description>An optimised design saves roughly 40% of the structure’s material against an over-designed one. Yet the main gain is space: walls about half as thick.</description><pubDate>Mon, 12 Oct 2026 16:35:07 GMT</pubDate><category>Why steel</category></item><item><title>References</title><link>https://massiveco.hu/references/</link><guid isPermaLink="true">https://massiveco.hu/references/</guid><description>We do not optimise for quantity: these projects are here because each involved something that had not been done in quite the same way before.</description><pubDate>Mon, 12 Oct 2026 16:35:07 GMT</pubDate><category>Overview</category></item><item><title>Hungarian Dance University</title><link>https://massiveco.hu/references/dance-university/</link><guid isPermaLink="true">https://massiveco.hu/references/dance-university/</guid><description>A 900 m² rooftop extension where the weight limit was critical: hot-rolled and cold-formed steel together.</description><pubDate>Mon, 12 Oct 2026 16:35:07 GMT</pubDate><category>Case studies</category></item><item><title>Continental demonstration house</title><link>https://massiveco.hu/references/demo-tiny-house/</link><guid isPermaLink="true">https://massiveco.hu/references/demo-tiny-house/</guid><description>A prototype built for show turned into a working building — and a 900 kg steel frame that carried a furnished 13-tonne house.</description><pubDate>Mon, 12 Oct 2026 16:35:07 GMT</pubDate><category>Case studies</category></item><item><title>Dojo, Pilisvörösvár</title><link>https://massiveco.hu/references/dojo/</link><guid isPermaLink="true">https://massiveco.hu/references/dojo/</guid><description>An Eastern roof form in light-gauge steel instead of carved timber — from the walls to the roof.</description><pubDate>Mon, 12 Oct 2026 16:35:07 GMT</pubDate><category>Case studies</category></item><item><title>Dune: Part Two — bridge towers</title><link>https://massiveco.hu/references/dune-bridge-towers/</link><guid isPermaLink="true">https://massiveco.hu/references/dune-bridge-towers/</guid><description>The supporting structure for the towers at either end of a bridge in the film — built in a shared, survey-aligned 3D model.</description><pubDate>Mon, 12 Oct 2026 16:35:07 GMT</pubDate><category>Case studies</category></item><item><title>House of Music Hungary</title><link>https://massiveco.hu/references/house-of-music/</link><guid isPermaLink="true">https://massiveco.hu/references/house-of-music/</guid><description>An undulating ceiling from flat composite sheets, and light wells with no existing technology. Two years, twelve designers, one shared model.</description><pubDate>Mon, 12 Oct 2026 16:35:07 GMT</pubDate><category>Case studies</category></item><item><title>Páty industrial hall</title><link>https://massiveco.hu/references/paty-hall/</link><guid isPermaLink="true">https://massiveco.hu/references/paty-hall/</guid><description>A faulty structural design caught at project start, and the whole general design redone on the fly — from a site office.</description><pubDate>Mon, 12 Oct 2026 16:35:07 GMT</pubDate><category>Case studies</category></item><item><title>Puskás Arena</title><link>https://massiveco.hu/references/puskas-arena/</link><guid isPermaLink="true">https://massiveco.hu/references/puskas-arena/</guid><description>Fixtures, sprinkler system and as-built documentation — with quantities verified from the BIM model in the contracts.</description><pubDate>Mon, 12 Oct 2026 16:35:07 GMT</pubDate><category>Case studies</category></item><item><title>Szeged swimming complex</title><link>https://massiveco.hu/references/szeged-pool/</link><guid isPermaLink="true">https://massiveco.hu/references/szeged-pool/</guid><description>The complete roof-cladding system redesigned mid-construction for Kingspan X-dek — some forty pages of connection details.</description><pubDate>Mon, 12 Oct 2026 16:35:07 GMT</pubDate><category>Case studies</category></item><item><title>Statutory design check or expert review?</title><link>https://massiveco.hu/regulations/design-check/</link><guid isPermaLink="true">https://massiveco.hu/regulations/design-check/</guid><description>The statutory design check is a licensed role; an expert review is an experienced designer’s opinion. We give the latter and point you to the former.</description><pubDate>Mon, 12 Oct 2026 16:35:07 GMT</pubDate><category>Permits and checks</category></item><item><title>Fire protection for thin-walled steel</title><link>https://massiveco.hu/regulations/fire-protection/</link><guid isPermaLink="true">https://massiveco.hu/regulations/fire-protection/</guid><description>Steel does not burn, but thin-walled sections heat up fast: they can twist and build up enough stress to break out of the wall. How it is proven.</description><pubDate>Mon, 12 Oct 2026 16:35:07 GMT</pubDate><category>Fire protection</category></item><item><title>NMÉ, ETA and CE: when you need them</title><link>https://massiveco.hu/regulations/nme-eta-ce/</link><guid isPermaLink="true">https://massiveco.hu/regulations/nme-eta-ce/</guid><description>ÉMI is an organisation, not a document. What NMÉ, ETA and CE each prove, who issues them, and when a light-gauge building needs none.</description><pubDate>Mon, 12 Oct 2026 16:35:07 GMT</pubDate><category>Certification</category></item><item><title>Services</title><link>https://massiveco.hu/services/</link><guid isPermaLink="true">https://massiveco.hu/services/</guid><description>The four services in one table: scope, required inputs and main outputs — and which one fits what you have now.</description><pubDate>Mon, 12 Oct 2026 16:35:07 GMT</pubDate><category>Overview</category></item><item><title>Do you keep our designs confidential?</title><link>https://massiveco.hu/services/confidentiality/</link><guid isPermaLink="true">https://massiveco.hu/services/confidentiality/</guid><description>We regularly review other offices’ work, so we take this seriously. Where uploads are stored, for how long and who can see them: see our privacy notice.</description><pubDate>Mon, 12 Oct 2026 16:35:07 GMT</pubDate><category>Way of working and pricing</category></item><item><title>Do you design or manufacture as well?</title><link>https://massiveco.hu/services/design-not-manufacture/</link><guid isPermaLink="true">https://massiveco.hu/services/design-not-manufacture/</guid><description>If you have no machine, we recommend a manufacturer who can build from our design: the machine program can go to any compatible line.</description><pubDate>Mon, 12 Oct 2026 16:35:07 GMT</pubDate><category>Fabrication design</category></item><item><title>Do you work with existing designs?</title><link>https://massiveco.hu/services/existing-designs/</link><guid isPermaLink="true">https://massiveco.hu/services/existing-designs/</guid><description>Yes. The most common case is not a faulty design, although that happens too, but a masonry house that needs to be redesigned in light-gauge steel.</description><pubDate>Mon, 12 Oct 2026 16:35:07 GMT</pubDate><category>Structural design package</category></item><item><title>Fabrication design</title><link>https://massiveco.hu/services/fabrication/</link><guid isPermaLink="true">https://massiveco.hu/services/fabrication/</guid><description>Panel drawings and machine programs for any LGS production line. The scope, the list of inputs we need, and the files delivered, with formats.</description><pubDate>Mon, 12 Oct 2026 16:35:07 GMT</pubDate><category>Fabrication design</category></item><item><title>Which format should I send the design in?</title><link>https://massiveco.hu/services/file-formats/</link><guid isPermaLink="true">https://massiveco.hu/services/file-formats/</guid><description>DWG, IFC, RVT, PDF, ZIP — whatever you have. Send the complete set, not a few sheets: the missing ones hold the questions we would ask later.</description><pubDate>Mon, 12 Oct 2026 16:35:07 GMT</pubDate><category>Way of working and pricing</category></item><item><title>General design</title><link>https://massiveco.hu/services/general/</link><guid isPermaLink="true">https://massiveco.hu/services/general/</guid><description>One contract, one responsible party, every discipline. The scope, the list of inputs we need, and the documents delivered, with formats.</description><pubDate>Mon, 12 Oct 2026 16:35:07 GMT</pubDate><category>General design</category></item><item><title>How long does general design take?</title><link>https://massiveco.hu/services/general-design-timeline/</link><guid isPermaLink="true">https://massiveco.hu/services/general-design-timeline/</guid><description>A permit design for a hall takes a few weeks; construction design for a complex public building, months. After the first meeting: a realistic schedule.</description><pubDate>Mon, 12 Oct 2026 16:35:07 GMT</pubDate><category>General design</category></item><item><title>How is this different from an architect?</title><link>https://massiveco.hu/services/how-general-design-differs/</link><guid isPermaLink="true">https://massiveco.hu/services/how-general-design-differs/</guid><description>For us the structure is part of the concept. If a form needs a disproportionate amount of steel, we say so in the first week — not at construction design.</description><pubDate>Mon, 12 Oct 2026 16:35:07 GMT</pubDate><category>General design</category></item><item><title>Machine programs: CSV or RFY?</title><link>https://massiveco.hu/services/machine-program/</link><guid isPermaLink="true">https://massiveco.hu/services/machine-program/</guid><description>A production line receives a file, not a drawing: where to cut and punch each element, and to what length. Most machines use CSV; FRAMECAD uses RFY.</description><pubDate>Mon, 12 Oct 2026 16:35:07 GMT</pubDate><category>Fabrication design</category></item><item><title>Project preparation and management</title><link>https://massiveco.hu/services/management/</link><guid isPermaLink="true">https://massiveco.hu/services/management/</guid><description>Schedule, quantities, contract appendices, supervision — on our own designs. Scope, inputs we need, documents delivered.</description><pubDate>Mon, 12 Oct 2026 16:35:07 GMT</pubDate><category>Preparation and management</category></item><item><title>Coordination only for our own design</title><link>https://massiveco.hu/services/management-own-design-only/</link><guid isPermaLink="true">https://massiveco.hu/services/management-own-design-only/</guid><description>Supervising another designer’s work, one can only point at the drawings. For our own design we take full responsibility — we drew and calculated it.</description><pubDate>Mon, 12 Oct 2026 16:35:07 GMT</pubDate><category>Preparation and management</category></item><item><title>Do I need to bring my own architect?</title><link>https://massiveco.hu/services/own-architect/</link><guid isPermaLink="true">https://massiveco.hu/services/own-architect/</guid><description>You do not need one, but we gladly work with yours. We build the team for the project, and your architect or engineer joins the same shared model.</description><pubDate>Mon, 12 Oct 2026 16:35:07 GMT</pubDate><category>General design</category></item><item><title>What happens after you contact us</title><link>https://massiveco.hu/services/process-and-pricing/</link><guid isPermaLink="true">https://massiveco.hu/services/process-and-pricing/</guid><description>We do not promise an exact number of hours — holidays and busy periods happen. What we can say: by industry standards, we respond quickly.</description><pubDate>Mon, 12 Oct 2026 16:35:07 GMT</pubDate><category>Way of working and pricing</category></item><item><title>Is a site visit required for design?</title><link>https://massiveco.hu/services/site-visits/</link><guid isPermaLink="true">https://massiveco.hu/services/site-visits/</guid><description>We are based in Budapest and mostly work remotely, which is enough for most projects. Where it is justified and you ask, we come on site.</description><pubDate>Mon, 12 Oct 2026 16:35:07 GMT</pubDate><category>Way of working and pricing</category></item><item><title>Which software do you use?</title><link>https://massiveco.hu/services/software/</link><guid isPermaLink="true">https://massiveco.hu/services/software/</guid><description>Structural analysis: AxisVM and ConSteel. Modelling: Tekla, Revit and ArchiCAD, with Vertex BD and FRAMECAD for LGS.</description><pubDate>Mon, 12 Oct 2026 16:35:07 GMT</pubDate><category>Way of working and pricing</category></item><item><title>Structural design package</title><link>https://massiveco.hu/services/structural/</link><guid isPermaLink="true">https://massiveco.hu/services/structural/</guid><description>Steel, LGS and timber structures from permit to construction. The scope, the list of inputs we need, and the documents delivered, with formats.</description><pubDate>Mon, 12 Oct 2026 16:35:07 GMT</pubDate><category>Structural design package</category></item><item><title>What happens to the designs I upload?</title><link>https://massiveco.hu/services/uploaded-files/</link><guid isPermaLink="true">https://massiveco.hu/services/uploaded-files/</guid><description>Stored on servers in the EU, kept for 90 days by default, and seen only by the colleagues on the project. We sign an NDA whenever asked.</description><pubDate>Mon, 12 Oct 2026 16:35:07 GMT</pubDate><category>Way of working and pricing</category></item><item><title>What does ‘usable BIM’ mean?</title><link>https://massiveco.hu/services/usable-bim/</link><guid isPermaLink="true">https://massiveco.hu/services/usable-bim/</guid><description>Many BIM models show what a building will look like, but help little on site because they were not built with the contractor’s workflow in mind.</description><pubDate>Mon, 12 Oct 2026 16:35:07 GMT</pubDate><category>General design</category></item></channel></rss>