Skip to content
Request a quote

Fabrication design: inputs

The items are numbered: when something is missing, we refer to its number.

  • B1 Construction or structural design, every sheet · IFC (preferred), DWG, PDF
  • B2 The production line’s type and controller · text
  • B3 Profile library: sections, steel thicknesses · spreadsheet, PDF — unless the machine is already surveyed
  • B4 Transport and assembly limits: largest panel, crane · text
  • B5 Whether structural verification is needed (item 7) · text

Upload on the contact page with your project ID — not by e-mail. On formats: Which format should I send the design in?

See also: Fabrication design — the scope · Outputs — what you receive