Skip to content
Request a quote

What we hand over at the end

This article is a skeleton — the content has to come from you

Section titled “This article is a skeleton — the content has to come from you”

On the site this article is a placeholder. The assumption was “BIM model + traditional 2D documentation”, but an exact list is needed. This is the article clients will read before signing.

Which sheets, at what scale, in what format? PDF, DWG, both? Are there printed copies, and how many?

Does the client receive the model? If so: in native format, as IFC, or for viewing only? At what level of development? Levels of development · Drawings or model.

Technical descriptions, calculations, schedules of quantities, the unpriced bill — which are included and which are options?

Permit, declarations, evidence of qualification.

May the model be edited on, and if so with what liability? Who may maintain it in future?

File sharing, media, a platform? For how long is it available?

Under legislation the contractual deliverable is the construction documentation — typically drawn and written material. The model, by comparison, is a matter of separate agreement. The content of the detailed design.

Beyond the drawings, the handover package also includes what is needed to operate the building: data on the products installed and documentation of the concealed work. Handover documentation.

The skeleton is here, the list is missing. Write out what you hand over — clients read this article before signing.