Which rooms, how large, how they connect, how many people use them.

What the plot and the regulations allow: coverage, height, siting. Local building code.

The most important part, and the one most often left out — yet it is where much of the cost is decided:

  • what finishes,
  • what sound insulation between rooms and between dwellings,
  • what floor feel is acceptable, Serviceability criteria,
  • what energy level is the aim beyond the minimum.

A realistic order of magnitude, and whether there is a fixed completion date.

Entirely normal. A client does not necessarily know in advance what level of sound insulation they want — it is our job to help with questions and to record the answers.

The design brief is often produced in the first stage of the design, not before it. The design brief.

Because an expectation stated verbally becomes a question of memory later. A written brief gives direction, is the reference point for decisions, and makes clear what changed when something changes.

The quality expectation translates directly into the build-up. If we do not know the expectation, we design to the minimum — and the occupant will notice. LGS build-ups.

The needs assessment is not a formality but the compass of the project. Most “this is not what I expected” sentences sit on a missing or unwritten brief.