Skip to content
Request a quote

The fastest route: send everything

It is the one thing in the process that is entirely up to you. The more information we get at the start, the sooner we can answer properly — and the fewer rounds it takes.

Do not upload two sheets of it, upload the whole set. The missing sheets are where the things we would ask about later show up: the connections, the build-ups, the service routes.

Format: DWG, IFC, RVT, PDF, ZIP — anything. The form is built for large files; there is no need to compress or split.

Everything that exists:

  • land registry number and title deed,
  • map extract,
  • the relevant part of the local building code,
  • utility data,
  • the ground investigation report, if one was made.

Without these we can only guess. If something is missing that is not a problem — but say that it is missing, so we know what has to be obtained. Site data and survey.

A hand-drawn sketch is a perfectly good starting point. It is often the thing we can think from fastest — far more so than a written description of an idea.

We store it on a European server for a limited period, and only the colleagues working on that project have access. Confidentiality.

The whole set, not two sheets. A sketch is worth more than a paragraph of description. This step decides how many rounds the next two weeks will take.