Permit or simple notification
Three categories
Section titled “Three categories”Work that needs neither permit nor notification
Section titled “Work that needs neither permit nor notification”The smaller works listed in the legislation. Technical and building-law requirements can still apply — not having to ask for a permit does not mean anything may be built.
Simple notification
Section titled “Simple notification”Within a defined range, typically the construction of a new dwelling of no more than 300 m² total useful floor area containing only residential and ancillary rooms, and in specified cases the extension of an existing dwelling, can be carried out under a simple notification.
There is no permit procedure here, but there is a notification, a mandatory design content and mandatory participants. Simple notification.
Building permit
Section titled “Building permit”In every other case. Here an authority procedure runs, ending in a decision. The permit procedure.
Why this has to be settled at the very start
Section titled “Why this has to be settled at the very start”Because everything else follows from it:
- The extent of the design. The permit procedure needs different documentation from the notification.
- The timing. A permit procedure can be planned for but takes time; the notification route allows a faster start.
- The participants. A design checker is mandatory in certain cases and not in others.
- The financing. Lending decisions and grants are often tied to the legal classification.
If the classification only emerges during the design, it can affect the documentation retrospectively.
What affects the classification
Section titled “What affects the classification”- the use (residential or other),
- the size and the useful floor area,
- for an existing building, the nature of the intervention — extension, alteration, change of use,
- the situation of the plot: protection, heritage, other restrictions,
- the local building code.
Where most of the mistakes happen
Section titled “Where most of the mistakes happen”Judging the use
Section titled “Judging the use”A “holiday home” that is in fact a dwelling, or a dwelling that will also contain a business function — these can produce a different classification.
The extent of an extension
Section titled “The extent of an extension”For an extension to an existing building the limits count differently from a new building.
Protected status
Section titled “Protected status”Heritage or nature protection can change the whole procedure.
This is not legal advice