Utility connections
What has to be settled
Section titled “What has to be settled”Whether there is capacity
Section titled “Whether there is capacity”A pipe in the street is not enough: the availability of the required capacity has to be confirmed. For electrical capacity and for drainage this is often the constraint.
Where the connection point is
Section titled “Where the connection point is”It determines the length and cost of the connection and affects the layout within the plot.
On what conditions
Section titled “On what conditions”Contributions, development charges, technical requirements.
How long it takes
Section titled “How long it takes”The lead time for the administration and the work — often the longest element of the project.
Where there is no mains
Section titled “Where there is no mains”Instead of drainage
Section titled “Instead of drainage”On-site wastewater treatment, if the regulations allow. It takes space and needs consent.
Instead of water
Section titled “Instead of water”A private well, where the conditions permit.
Instead of gas
Section titled “Instead of gas”Today we generally do not design with gas at all: a heat pump or another solution, which increases the electrical demand — which comes back to the question of electrical capacity.
Why it affects the structure
Section titled “Why it affects the structure”Utility connections pass through the structure: through the slab, the wall, the floor.
In light gauge steel these penetrations:
- affect the vapour control, The principle of vapour control,
- require fire stopping, Fire stopping of penetrations,
- and are a structural question where they are large.
So the position of the penetrations has to be known before manufacture — cutting them afterwards is substantially worse.
The order of design
Section titled “The order of design”- Obtain the utility data.
- Services concept to suit it.
- Fix the routes and the penetrations.
- Structural design containing them.
- Manufacture.
Upset that order and the fault is locked into the manufacture.
The point
Section titled “The point”Utility administration can be the slowest element of the project and the earliest one that can be started. Start it in the first week.