The permit package

The full documentation required for the authority procedure, with the disciplines’ input.

The content is set by legislation, not by us — so the itemised list sits in the technology knowledge base. The content of the permit design · The building permit procedure.

Not parts produced one after another, but coordinated documentation. The contradiction comes out at the drawing board, not in a request for missing items.

We handle the submission and the procedure if you want. If you would rather do it yourself, that is fine too — we hand over the documentation ready to submit.

The structural part is not a chapter added afterwards: it continues the structural principle settled at concept. The structural part of the permit design.

The permit says the building may be built — not that it has been designed. Building it takes a detailed design. Detailed design and BIM.

And the content of the construction documentation may not depart from the final and enforceable permit. If a solution differing from the permitted one emerges during detailed design, the permit has to be amended.

Within a defined range of single dwellings, simple notification is enough. There the package and the process are different. The simple notification package · Permit or simple notification.

The permit design speaks to the authority. Having the permit does not mean you can start building — only that you are allowed to.