Working with the other disciplines
Where the mistakes arise
Section titled “Where the mistakes arise”Not inside the disciplines but at their boundaries: where everyone assumed the other would do it. Boundaries of responsibility.
What has to be supplied to the structure
Section titled “What has to be supplied to the structure”From the architect
Section titled “From the architect”- build-ups with weights,
- the opening layout, finalised,
- finishes and their sensitivity — the deflection limit comes from this,
- ceiling heights and structural depths.
Input data from the architect.
From the services engineer
Section titled “From the services engineer”- the position and size of penetrations,
- plant weights and their locations,
- the routes of the main risers,
- the requirement on the service cavity.
Web holes and service openings · Service cavity.
From the fire designer
Section titled “From the fire designer”- the fire resistance requirement on the structure,
- the material class limits in the build-up.
What the structure gives back
Section titled “What the structure gives back”- foundation reactions to the geotechnical engineer,
- structural depths to the architect,
- where and how large penetrations may be, to the services engineer,
- the position of the shear walls, which binds the floor plan.
The four typical clash points
Section titled “The four typical clash points”On LGS and steelwork projects it is always the same four:
- service routes in the structure,
- fire requirements and the build-up,
- energy and thermal bridging,
- the architectural opening layout and the bracing.
Why it has to happen early
Section titled “Why it has to happen early”Because with a prefabricated structure the design fixes earlier. What can still be changed on site in a masonry house is already manufactured here. Coordination between disciplines.
The point
Section titled “The point”Every discipline looks at the same building through different glasses. A good design is not the sum of the disciplines but the result of their discussion.