Working with the other disciplines

Not inside the disciplines but at their boundaries: where everyone assumed the other would do it. Boundaries of responsibility.

  • build-ups with weights,
  • the opening layout, finalised,
  • finishes and their sensitivity — the deflection limit comes from this,
  • ceiling heights and structural depths.

Input data from the architect.

  • the position and size of penetrations,
  • plant weights and their locations,
  • the routes of the main risers,
  • the requirement on the service cavity.

Web holes and service openings · Service cavity.

  • the fire resistance requirement on the structure,
  • the material class limits in the build-up.

Fire design.

  • foundation reactions to the geotechnical engineer,
  • structural depths to the architect,
  • where and how large penetrations may be, to the services engineer,
  • the position of the shear walls, which binds the floor plan.

On LGS and steelwork projects it is always the same four:

  1. service routes in the structure,
  2. fire requirements and the build-up,
  3. energy and thermal bridging,
  4. the architectural opening layout and the bracing.

Design disciplines.

Because with a prefabricated structure the design fixes earlier. What can still be changed on site in a masonry house is already manufactured here. Coordination between disciplines.

Every discipline looks at the same building through different glasses. A good design is not the sum of the disciplines but the result of their discussion.