The ground investigation report

A ground investigation report typically gives:

  • the stratigraphy: which layers follow one another and to what depth,
  • the physical and mechanical properties of the layers,
  • the water table and its likely fluctuation,
  • findings on bearing capacity and settlement,
  • a recommendation on the foundation type and depth,
  • a warning about particular risks: swelling clay, made ground, organic layers, voids.

The surface of a plot tells you nothing about what is beneath. A layer of made ground or the remains of an earlier building does not show at the surface.

The neighbour’s experience is not enough

Section titled “The neighbour’s experience is not enough”

Ground conditions can change within a few metres.

A foundation mistake is hard to repair afterwards: settlement, cracking, structural damage. The cost of an investigation is negligible against that.

What to view differently for a light structure

Section titled “What to view differently for a light structure”

Because of the low pressure, more ground types are suitable than for a heavy building. That holds even where the ground is otherwise weak — which is why a simpler foundation can often be designed.

The ground also has to take tension where the anchorage goes into it. That matters especially with ground screws.

Differential settlement is more of a problem

Section titled “Differential settlement is more of a problem”

An accurate, stiff frame tolerates differential movement less well than a masonry structure, which “absorbs” it in cracks. So limiting differential settlement matters.

The depth of investigation is not always the same: it follows the complexity of the task. A simple, small building on known ground calls for less investigation than a complex structure on difficult ground. Geotechnical categories.

Before buying the plot, if possible — or at least at the start of the design. The foundation type is one of the largest cost items, and the ground makes that decision, not the designer.

A ground investigation is not a cost but risk reduction. Either you get to know the ground in advance or you get to know it during construction — and that is more expensive.