What we hand over

Member-by-member panel drawings, with position numbering. The measure: detailed enough that the erector does not have to ask on site.

By profile, with lengths and quantities — procurement works from it.

A file for the line controller, tailored to that machine’s parameters: CSV, or RFY for FRAMECAD. The machine program: what we hand over.

Marking and assembly sequence where it makes sense. The marking is structural information: with mixed material thicknesses a swapped member looks no different. Marking and assembly logic.

The build-up and the disciplines’ drawings — unless those are part of the appointment too. Shop design covers the frame.

And it does not include fire verification: that has to be decided separately. When no system document is required.

The panel drawings and the take-off, for the life of the building. At a later alteration they tell you where there is a stud and where there is a nogging behind the lining. What you can hang on the wall · Later alterations.

The measure is simple: the erector should not have to ask. If they ask, the drawings were incomplete — not the erector careless.