Cost estimating by the designer

From unit rates: floor area, building type, quality level. This gives an order of magnitude, not a price. The margin of error is significant.

The dimensions, the structural system and the main build-ups are known. The estimate is more accurate, but the details are still open.

An itemised bill based on quantities. This is what comparable tenders can be sought on. The content of the detailed design.

The biggest cost decisions — massing, spans, structural system, quality level — are made at the concept stage, when the estimate is least accurate.

So cost-conscious design does not start at the detailed design but at the beginning: that is where the consequences of the decisions have to be visible, at least in order of magnitude.

Complex massing, many corners, many different spans — all of them add cost.

Half a metre less span often means a whole section size smaller, throughout the building.

Finishes, services, sound insulation expectations.

On the material cost of the structure itself, roughly 40% can be saved with a well-calculated, optimised design compared with an over-sized one. For the other disciplines this cannot be measured as precisely, but a more accurate structure is easier and faster to work to.

Often the largest uncertainty in the estimate.

  • the contractor’s risk and margin,
  • market movement,
  • a contingency for unforeseen items,
  • permitting and utility costs, unless separately named.

These have to be handled separately, or the estimate and reality part company.

Cost is decided by the concept, not by the detailed design. The accuracy of the estimate grows later, while the ability to influence it shrinks.